Quick answers
What is Laying of Optical Fibre Cable?
Laying of Optical Fibre Cable is a lapsed telecom project in Tirutteri R F, Chengalpattu, Tamil Nadu. The site covers 0.1 acres.
Who is building it?
The applicant is Tata Communications Limited.
Has it been approved?
No. The application was lapsed on 2 Mar 2025, so it is no longer under consideration.
Where is it?
In Tirutteri R F, Chengalpattu, Tamil Nadu.
How big is it?
It has a stated cost of ₹20 lakh; a site of 0.1 acres and 380 m² of forest land.
When was it filed?
The application was filed on 1 Apr 2023.
Project details
| Official title | Laying of Optical Fibre Cable in Veerapuram Village of Thirutteri Reserve Forest in Chengalpattu district |
|---|---|
| Status | Lapsed |
| Status since | 2 Mar 2025 |
| Application filed | 1 Apr 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Tata Communications Limited |
| Land area | 400 m² |
| Forest land | 380 m² |
| Project cost | ₹20 lakh |
| Village / locality | Tirutteri R F |
| Taluk / tehsil | Chengalpattu |
| District | Chengalpattu |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-06413 |
In context
46 applications in Chengalpattu since January 2022 are in the same category (Telecom): 1 approved, 3 filed or under review, and 42 withdrawn, lapsed or rejected. At 0.1 acres, this one is smaller than 87% of them.
45 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tirutteri R F, Chengalpattu, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rediversion of forest area for Laying of Optical Fibre Cable — lapsed, 0 m away
- Relaying and Periodical Maintenance of GST Road to Veerapuram Road — lapsed, 550 m away
- Relaying and Periodical Maintenance of GST Road to Veerapuram Road — lapsed, 550 m away
- Proposed Expansion and Construction of Multi – storied Residential Group… — under environmental review, 600 m away
- Proposed Expansion and Construction of Multi – storied Residential Group… — cleared for impact study, 600 m away
- Proposed Multi-Storied Residential Group Development by Alliance Budget… — environmental approval granted, 600 m away
- Proposed Multi-Storied Residential Group Development by Alliance Budget… — environmental approval granted, 600 m away
- Residential building by M/s. Mahindra World City Developers Limited — environmental approval granted, 750 m away
All 3 Tata Communications projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.