Quick answers
What is this project?
Proposed Expansion of Educational Institution with Medical College and Multispecialty Hospital by M/s. Jagannath Medical College and Hospital (A Unit of Sri Venkateshwara Educational and Charitable Trust) is a proposed building project in Tandalam, Tiruporur, Chengalpattu, Tamil Nadu. The site covers 13 acres.
Who is building it?
The applicant is Sri Venkateshwara Educational and Charitable Trust.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Tandalam, Tiruporur, Chengalpattu, Tamil Nadu.
How big is it?
It has a stated cost of ₹24.7 crore and a site of 13 acres.
When was it filed?
The application was filed on 10 Mar 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 10 Nov 2026 |
| Application filed | 10 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Sri Venkateshwara Educational and Charitable Trust |
| Land area | 13 acres (5.3 ha) |
| Project cost | ₹24.7 crore |
| Village / locality | Tandalam |
| Taluk / tehsil | Tiruporur |
| District | Chengalpattu |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04808 |
In context
302 applications in Chengalpattu since January 2022 are in the same category (Buildings & townships): 206 approved, 67 filed or under review, and 29 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 13 acres, this one is larger than 57% of them.
27 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tandalam, Tiruporur, Chengalpattu, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Synthetic Organic Chemicals (Protected Amino Acid and… — cleared for impact study, 1.5 km away
- Industrial project by M/s Pure Organic Industries — environmental approval granted, 1.7 km away
- Proposed Change in Product Mix within Existing API Manufacturing Facility — initial checks, 1.8 km away
- Proposed Change in Product Mix within Existing API Manufacturing Facility — initial checks, 1.8 km away
- Proposed Expansion of Existing Production Capacity — under environmental review, 1.9 km away
- Proposed Expansion of Existing Production Capacity — under environmental review, 1.9 km away
- Proposed Expansion for Manufacturing of Synthetic Organic Chemicals – API… — environmental approval granted, 1.9 km away
- Proposed Expansion for Manufacturing of Synthetic Organic Chemicals – API… — environmental approval granted, 1.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.