Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Mar 2026 |
| Application filed | 3 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Ola Electric Technologies Private Limited |
| Use | Industrial |
| Floors (tallest) | 1 |
| Height | 20 m |
| Land area | 135 acres (54.6 ha) |
| Built-up area | 1,20,501 m² (12,97,061 sq ft) |
| Plot area | 5,46,164 m² (58,78,855 sq ft) |
| Project cost | ₹1,526.3 crore |
| Village / locality | Balethottam |
| Taluk / tehsil | Pochampalli |
| District | Krishnagiri |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-05008 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 3 Feb 2026 (this page) | Environmental approval granted | 135 acres | ₹1,526.3 crore |
| Early planning filed 8 Sept 2025 | Cleared for impact study | 135 acres | ₹1,526.3 crore |
In context
78 applications in Krishnagiri since January 2022 are in the same category (Buildings & townships): 53 approved, 18 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 40 days from filing to approval. At 135 acres, this one is larger than 83% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Balethottam, Pochampalli, Krishnagiri, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building project by OLA Electric Technologies Private Limited — cleared for impact study, 0 m away
- Proposed Expansion of Existing Special Economic Zone in Bargur Sipcot… — cleared for impact study, 650 m away
- Integrated Common Hazardous Waste Treatment, Storage & Disposal Facility by… — environmental approval granted, 900 m away
- Proposed Manufacturing of API & API Intermediates — environmental approval granted, 1 km away
- Proposed Manufacturing of Dyes and Dye Intermediates Facility — environmental approval granted, 1.3 km away
- Proposed Manufacturing of Dyes and Dye Intermediates Facility — cleared for impact study, 1.3 km away
- Building project by M/s. OLA CELL TECHNOLOGIES PRIVATE LIMITED — environmental approval granted, 1.4 km away
- Building project by M/s. OLA CELL TECHNOLOGIES PRIVATE LIMITED — environmental approval granted, 1.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.