Quick answers
What is this project?
Proposed Rough stone and Gravel Quarry of Thiru.S.Subramanian is an approved mining project in Melkalingal, Veerakeralamputhur, Tenkasi, Tamil Nadu. The site covers 10.9 acres.
Who is building it?
The applicant is Subramanian Shanmugavel.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Mar 2026), as of 27 Nov 2026.
Where is it?
In Melkalingal, Veerakeralamputhur, Tenkasi, Tamil Nadu.
How big is it?
It has a stated cost of ₹4.7 crore and a site of 10.9 acres.
When was it filed?
The application was filed on 13 Jan 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Mar 2026 |
| Application filed | 13 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Subramanian Shanmugavel |
| Land area | 10.9 acres (4.4 ha) |
| Project cost | ₹4.7 crore |
| Village / locality | Melkalingal |
| Taluk / tehsil | Veerakeralamputhur |
| District | Tenkasi |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-05082 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Jan 2026 (this page) | Environmental approval granted | 10.9 acres | ₹4.7 crore |
| Early planning filed 7 Feb 2025 | Cleared for impact study | 10.9 acres | ₹4.7 crore |
In context
74 applications in Tenkasi since January 2022 are in the same category (Mining): 65 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 10.9 acres, this one is larger than 85% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Melkalingal, Veerakeralamputhur, Tenkasi, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Rough stone and Gravel Quarry of Thiru.S.Subramanian — cleared for impact study, 0 m away
- TMT. C. Maheshwari Rough Stone and Gravel Quarry — environmental approval granted, 4.3 km away
- Thiru.N.H.M.Pandian Rough Stone and Gravel Quarry — environmental approval granted, 4.3 km away
- Thiru.N.H.M.Pandian Rough Stone and Gravel Quarry — environmental approval granted, 4.3 km away
- Thiru.N.H.M.Pandian Rough Stone and Gravel Quarry — cleared for impact study, 4.3 km away
- TMT. C. Maheshwari Rough Stone and Gravel Quarry — environmental approval granted, 4.4 km away
- Rough Stone, Jelly and Gravel Quarry of Thiru.R.Ponkaliraj — environmental approval granted, 4.6 km away
- Surandai Part I Rough Stone, Weathered Rock and Gravel Quarry — environmental approval granted, 4.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.