Project details
| Status | Initial checks |
|---|---|
| Status since | 29 Jan 2026 |
| Application filed | 29 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Arun Smelters Private Limited |
| Use | Industrial |
| Land area | 3.6 acres (1.5 ha) |
| Plot area | 14,500 m² (1,56,077 sq ft) |
| Project cost | ₹32.2 crore |
| Village / locality | Palaya Gummidipundi |
| Taluk / tehsil | Gummidipoondi |
| District | Thiruvallur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-05336 |
In context
119 applications in Thiruvallur since January 2022 are in the same category (Buildings & townships): 69 approved, 37 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.6 acres, this one is smaller than 88% of them.
35 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Palaya Gummidipundi, Gummidipoondi, Thiruvallur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Existing Steel rolling mill by M/s. Arun Vyapar Udyog Pvt Ltd — application filed, 150 m away
- Existing Steel rolling mill by M/s. Arun Vyapar Udyog Pvt Ltd — cleared for impact study, 150 m away
- Proposed Expansion of Steel Rolling Mill & inclusion of Steel Melting Shop in… — more information requested, 300 m away
- Proposed Expansion of Steel Rolling Mill & inclusion of Steel Melting Shop in… — cleared for impact study, 300 m away
- Proposed Expansion of Steel Rolling Mill & inclusion of Steel Melting Shop in… — under wildlife review, 300 m away
- Proposed Expansion of Steel Rolling Mill & inclusion of Steel Melting Shop in… — more information requested, 300 m away
- Proposed Expansion of Steel Rolling Mill & inclusion of Steel Melting Shop in… — cleared for impact study, 300 m away
- Expansion of Existing Billets manufacturing facility from 26,000 Tons per… — lapsed, 400 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.