One of 2 filings for this project. The project's main page, with every filing and where each stands: 11 KV HT Electrical Line with post erection works across Papanasam RF
Project details
| Status | Lapsed |
|---|---|
| Status since | 22 Nov 2025 |
| Application filed | 3 Aug 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Paulsamy Vijayaraj |
| Land area | 2.2 acres (0.9 ha) |
| Forest land | 2.2 acres (0.9 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Aladiyur Part 2 |
| Taluk / tehsil | Ambasamudram |
| District | Tirunelveli |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-05923 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Aug 2023 (this page) | Lapsed | 2.2 acres | ₹5 lakh |
| New project filed 16 Jul 2023 | Under wildlife review | 2.2 acres | ₹5 lakh |
In context
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Aladiyur Part 2, Ambasamudram, Tirunelveli, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 11KV HT Electrical Line with Post erection works across Papanasam RF… — lapsed, 0 m away
- 11 KV HT Electrical Line with post erection works across Papanasam RF — under wildlife review, 0 m away
- Providing Pipeline with motor Arrangements to Thirupanipuram ( From River) in… — withdrawn, 450 m away
- Providing Pipeline with motor Arrangements to Thirupanipuram ( From River) in… — lapsed, 550 m away
- Desilting of Papanasam Diversion Weir — more information requested, 1 km away
- Constructions of Annadhanakoodam & Devotees Dormitory for Arulmigu Sorimuthu… — lapsed, 5.6 km away
- Laying of OFC by overhead through TNEB poles departmentally for effective… — lapsed, 6.2 km away
- BSNL OFC Laying work (Over Head) to Provide FTTH to the Govt. Offices and… — more information requested, 6.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.