One of 2 filings for this project. The project's main page, with every filing and where each stands: Providing Pipeline with motor Arrangements to Thirupanipuram ( From River) in…
Project details
| Status | Lapsed |
|---|---|
| Status since | 16 Apr 2026 |
| Application filed | 10 Sept 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Water & irrigation |
| Applicant | V C Remadevi |
| Land area | 500 m² |
| Forest land | 500 m² |
| Project cost | ₹20 lakh |
| Village / locality | Aladiyur Part 2 |
| Taluk / tehsil | Ambasamudram |
| District | Tirunelveli |
| State | Tamil Nadu |
| Location from | Site area on record |
| Our reference | WID-TN-05984 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Oct 2025 | Withdrawn | 2.6 acres | ₹20 lakh |
| Change of use filed 10 Sept 2025 (this page) | Lapsed | 0.1 acres | ₹20 lakh |
In context
10 applications in Tirunelveli since January 2022 are in the same category (Water & irrigation): 0 approved, 5 filed or under review, and 5 withdrawn, lapsed or rejected.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Aladiyur Part 2, Ambasamudram, Tirunelveli, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Providing Pipeline with motor Arrangements to Thirupanipuram ( From River) in… — withdrawn, 100 m away
- 11KV HT Electrical Line with Post erection works across Papanasam RF… — lapsed, 550 m away
- 11 KV HT Electrical Line with post erection works across Papanasam RF — lapsed, 550 m away
- 11 KV HT Electrical Line with post erection works across Papanasam RF — under wildlife review, 550 m away
- Desilting of Papanasam Diversion Weir — more information requested, 1.6 km away
- Constructions of Annadhanakoodam & Devotees Dormitory for Arulmigu Sorimuthu… — lapsed, 5.5 km away
- Laying of OFC by overhead through TNEB poles departmentally for effective… — lapsed, 6.3 km away
- BSNL OFC Laying work (Over Head) to Provide FTTH to the Govt. Offices and… — more information requested, 6.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.