Project details
| Official title | Proposed Construction of Training Walls for Permanent Stability of Bar Mouth at Pulicat Village, Ponneri Taluk, Tiruvallur District of Tamil Nadu. |
|---|---|
| Status | More information requested |
| Status since | 25 Oct 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Department of Fisheries |
| Land area | 20.2 acres (8.2 ha) |
| Project cost | ₹27 crore |
| Village / locality | Avurivakkam |
| Taluk / tehsil | Ponneri |
| District | Thiruvallur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-06495 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project (this page) | More information requested | 20.2 acres | ₹27 crore |
| New project | Application filed | 20.2 acres | ₹27 crore |
In context
119 applications in Thiruvallur since January 2022 are in the same category (Buildings & townships): 69 approved, 37 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 20.2 acres, this one is smaller than 54% of them.
Where it is
Avurivakkam, Ponneri, Thiruvallur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Training Walls for Permanent Stability of Bar Mouth — application filed, 0 m away
- CRZ Clearance/Recommendation for Proposed 'Construction of Educational… — more information requested, 6.2 km away
- Poovami Ordinary Earth Quarry — decision issued, 10.9 km away
- Poovami Ordinary Earth Quarry — more information requested, 10.9 km away
- Poovami Ordinary Earth Quarry — more information requested, 10.9 km away
- Poovami Ordinary Earth Quarry — more information requested, 10.9 km away
- Proposed Quarrying of Ordinary Earth (30,000 m³) from lake area — more information requested, 13.9 km away
- Regassified Liquified Natural Gas (RLNG) Based Combined Cycle Power Plant [900… — cleared for impact study, 15.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.