Project details
| Official title | CRZ Clearance/Recommendation for Proposed 'Construction of Educational Institution Building - Ground+2 Floors' fully in 'Outside CRZ Area' with Driveways, Parking Facilities & OSR in CRZ-IA Area - at S F No. 52/3 in Pazhaverkadu (Edamani) of Pulicat Village, Ponneri Taluk, Tiruvallur District by Franciscan Sisters of St. Joseph Society No. IV |
|---|---|
| Status | More information requested |
| Status since | 23 Nov 2026 |
| Application filed | 18 Nov 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Franciscan Sisters of St Joseph Society No IV |
| Land area | 1.5 acres (0.6 ha) |
| Project cost | ₹4.9 crore |
| Village / locality | Pulicat |
| Taluk / tehsil | Ponneri |
| District | Thiruvallur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-07120 |
In context
119 applications in Thiruvallur since January 2022 are in the same category (Buildings & townships): 69 approved, 37 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.5 acres, this one is smaller than 97% of them.
Where it is
Pulicat, Ponneri, Thiruvallur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Kattupalli Port Expansion: A ₹2,566-Crore Upgrade for Thiruvallur, Tamil Nadu (10.7 km away).
Other projects nearby
- Training Walls for Permanent Stability of Bar Mouth — more information requested, 6.2 km away
- Training Walls for Permanent Stability of Bar Mouth — application filed, 6.2 km away
- Poovami Ordinary Earth Quarry — decision issued, 8.8 km away
- Poovami Ordinary Earth Quarry — more information requested, 8.8 km away
- Poovami Ordinary Earth Quarry — more information requested, 8.8 km away
- Poovami Ordinary Earth Quarry — more information requested, 8.8 km away
- Regassified Liquified Natural Gas (RLNG) Based Combined Cycle Power Plant [900… — cleared for impact study, 9.3 km away
- Crz Clearance for Construction of Shore Protection Measures to Safeguard… — lapsed, 10.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.