Project details
| Official title | Proposed Construction of Sewer Line Underground System by CMWSSB through Edayanchavadi, Sadayankuppam and Kadapakkam |
|---|---|
| Status | Coastal clearance granted |
| Status since | 12 Dec 2025 |
| Application filed | 17 Sept 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Other |
| Applicant | Chennai Metropolitan Water Supply and Sewerage Board |
| Land area | 8,055.2 acres (3,259.8 ha) |
| Project cost | ₹238.5 crore |
| Village / locality | Edayanchavadi |
| Taluk / tehsil | Tiruvottiyur |
| District | Chennai |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-06787 |
In context
7 applications in Chennai since January 2022 are in the same category (Other): 2 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected.
18 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Edayanchavadi, Tiruvottiyur, Chennai, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Active Pharmaceutical Ingredients (APIs) Manufacturing… — cleared for impact study, 1.9 km away
- Building project by Toshiba Jsw Power Systems Private Limited — environmental approval granted, 2 km away
- Expansion of existing Expandable Polystyrene Unit from 550MTPM to 2750 MTPM — under environmental review, 3.2 km away
- Expansion of Expandable Polystyrene (EPS) Production Capacity from 33,000 MTPA… — returned to applicant, 3.2 km away
- "re-Routing of Initial 0-5.5 Km Pipeline Section in Chennai-Asanur Section of… — coastal clearance granted, 3.3 km away
- Expansion of Caustic Soda Production Capacity From 150 Tpd to 250 Tpd by… — environmental approval granted, 3.3 km away
- EC Amendment Of Renewable Energy Transition Through Energy Backup System In… — under environmental review, 3.5 km away
- Facility for Resorcinol - Formaldehyde Resin (25 Mt/ Month) Within the… — returned to applicant, 3.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.