Project details
| Official title | Proposed Construction of Tail end check Dam across Nambiyar River in Thiruvambalapuram Village, Radhapuram Taluk, Tirunelveli District |
|---|---|
| Status | More information requested |
| Status since | 13 Nov 2026 |
| Application filed | 11 Sept 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Water Resource Department |
| Land area | 500 m² |
| Project cost | ₹30 crore |
| Village / locality | Tiruvambalapuram |
| Taluk / tehsil | Radhapuram |
| District | Tirunelveli |
| State | Tamil Nadu |
| Location from | Site area on record |
| Our reference | WID-TN-06954 |
In context
34 applications in Tirunelveli since January 2022 are in the same category (Buildings & townships): 19 approved, 12 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.1 acres, this one is smaller than 97% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tiruvambalapuram, Radhapuram, Tirunelveli, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tail end check Dam across Nambiyar River — lapsed, 700 m away
- Thiru. S. Velu, Kasthurirengapuram Part-II Rough stone and Gravel Quarry… — environmental approval granted, 4.5 km away
- Thiru. S. Velu, Kasthurirengapuram Part-II Rough stone and Gravel Quarry… — cleared for impact study, 4.5 km away
- Thiru.S.Sakthiperiyakumaran Over an extent of 4.50.2hectares of Patta land in… — environmental approval granted, 4.7 km away
- Rough Stone and Gravel Quarry Project Belongs to C. Robinraj — environmental approval granted, 6.4 km away
- Thiru. C. Robin Raj, Rough stone and Gravel Quarry Project over an Extent of… — not approved, 6.4 km away
- Thiru. C. Robin Raj, Rough stone and Gravel Quarry Project over an Extent of… — environmental approval granted, 6.4 km away
- Thiru. C. Robin Raj, Rough stone and Gravel Quarry Project over an Extent of… — cleared for impact study, 6.4 km away
All 8 Water Resource Department projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.