Quick answers
What is this project?
M/s Debabrata Dey Sand, Fulkumari Sand Mining, Plot No.- 854(P) is a proposed mining project in Chandrapur Reserved Forest, Udaipur, Gomati, Tripura. The site covers 2.3 acres.
Who is building it?
The applicant is Debabrata Dey.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Chandrapur Reserved Forest, Udaipur, Gomati, Tripura.
How big is it?
It has a stated cost of ₹10 lakh and a site of 2.3 acres.
When was it filed?
The application was filed on 4 Sept 2025.
Project details
| Status | Initial checks |
|---|---|
| Status since | 9 Jul 2026 |
| Application filed | 4 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Debabrata Dey |
| Land area | 2.3 acres (0.9 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Chandrapur Reserved Forest |
| Taluk / tehsil | Udaipur |
| District | Gomati |
| State | Tripura |
| Location from | Site boundary on record |
| Our reference | WID-TR-00128 |
In context
46 applications in Gomati since January 2022 are in the same category (Mining): 5 approved, 37 filed or under review, and 4 withdrawn, lapsed or rejected. At 2.3 acres, this one is larger than 65% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Chandrapur Reserved Forest, Udaipur, Gomati, Tripura. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s Bidhu Debnath Sand, Block Id: UMT/GMT-015 — more information requested, 550 m away
- Exploratory Drilling Location BRMAO — initial checks, 2.2 km away
- Mining project by M/s PRADIP SAND — initial checks, 3.2 km away
- Pitra Sand Block Mine — initial checks, 3.6 km away
- M/s Sudhir Sand(Prop.Sudhir Ghosh), Block ID-UMT/GMT-009, Sand Mining, udaipur… — initial checks, 4.5 km away
- Exploration of Hydrocarbon / Natural Gas through Drilling, Waste-pit and… — more information requested, 4.6 km away
- Mining project by M/S Samar Baidya Sand — environmental approval granted, 5.1 km away
- Drilling of Exploratory Location AA-ONO-184-BOA-B — initial checks, 7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.