Quick answers
What is Mining project by M/s PRADIP SAND?
This proposed mining project by M/s PRADIP SAND is in Phulkumari, Udaipur, Gomati, Tripura. The site covers 2.7 acres.
Who is building it?
The applicant is Pradip Kumar Saha.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Phulkumari, Udaipur, Gomati, Tripura.
How big is it?
It has a stated cost of ₹10 lakh and a site of 2.7 acres.
When was it filed?
The application was filed on 14 Sept 2025.
Project details
| Status | Initial checks |
|---|---|
| Status since | 9 Jul 2026 |
| Application filed | 14 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pradip Kumar Saha |
| Land area | 2.7 acres (1.1 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Phulkumari |
| Taluk / tehsil | Udaipur |
| District | Gomati |
| State | Tripura |
| Location from | Site boundary on record |
| Our reference | WID-TR-00143 |
In context
46 applications in Gomati since January 2022 are in the same category (Mining): 5 approved, 37 filed or under review, and 4 withdrawn, lapsed or rejected. At 2.7 acres, this one is larger than 70% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Phulkumari, Udaipur, Gomati, Tripura. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/s Sudhir Sand(Prop.Sudhir Ghosh), Block ID-UMT/GMT-009, Sand Mining, udaipur… — initial checks, 1.6 km away
- Mining project by M/S Samar Baidya Sand — environmental approval granted, 2 km away
- Pitra Sand Block Mine — initial checks, 2.8 km away
- M/s Debabrata Dey Sand, Fulkumari Sand Mining, Plot No.- 854(P) — initial checks, 3.2 km away
- Mining project by M/s Bidhu Debnath Sand, Block Id: UMT/GMT-015 — more information requested, 3.6 km away
- Mining project by M/s Bulbul Sand, Block Id: UMT/GMT-007 — more information requested, 5 km away
- Exploration of Hydrocarbon / Natural Gas through Drilling, Waste-pit and… — more information requested, 5 km away
- Exploratory Drilling Location BRMAO — initial checks, 5.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.