Quick answers
What is this project?
Exploration of Hydrocarbon / Natural Gas through Drilling and Waste-pit of Exploratory location BRMAM is a lapsed mining project in Baramura Deotamura R.F, Santirbazar, South Tripura, Tripura. The site covers 11.1 acres.
Who is building it?
The applicant is Oil and Natural Gas Corporation (ONGC).
Has it been approved?
No. The application was lapsed on 20 Sept 2026, so it is no longer under consideration.
Where is it?
In Baramura Deotamura R.F, Santirbazar, South Tripura, Tripura.
How big is it?
It has a stated cost of ₹18 crore; a site of 11.1 acres and 5.6 acres (2.3 ha) of forest land.
When was it filed?
The application was filed on 23 Mar 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 20 Sept 2026 |
| Application filed | 23 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Oil and Natural Gas Corporation (ONGC) |
| Land area | 11.1 acres (4.5 ha) |
| Forest land | 5.6 acres (2.3 ha) |
| Project cost | ₹18 crore |
| Village / locality | Baramura Deotamura R.F |
| Taluk / tehsil | Santirbazar |
| District | South Tripura |
| State | Tripura |
| Location from | Site boundary on record |
| Our reference | WID-TR-00235 |
In context
26 applications in South Tripura since January 2022 are in the same category (Mining): 6 approved, 17 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 11.1 acres, this one is larger than 58% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Baramura Deotamura R.F, Santirbazar, South Tripura, Tripura. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion Additonal Forest Land for Resettlement of Bru Migrants and Approach… — forest land use approved, 9.5 km away
- Diversion of Forest Land for the Upgradation of the Santirbazar to Karbook… — under forest review, 9.9 km away
- Tripura Oil and Gas Exploration Block AA-ONN-2002/1 NELP-IV (Jubilant Oil &… — in-principle approval, conditions pending, 10 km away
- Tripura Oil & Gas Exploration Block Aa Onn 2002 1 Nelp IV Proposed for… — more information requested, 10.2 km away
- Total 0.567 hectors Forest Land diversion proposal for construction of… — more information requested, 10.9 km away
- "diversion of Forest Land for the Constriction of Road From Kowaifung… — more information requested, 11.9 km away
- Kirit Bikram Memorial Academy at Mouja Birchandra nagar, Tehesil Birchandra… — lapsed, 12.4 km away
- Mining project by M/s Sharma Sand, Block ID: UMT/ST-007 — environmental approval granted, 12.5 km away
More from Oil and Natural Gas Corporation (ONGC) in South Tripura
- Re-diversion of 2.82 Ha of Forest Land for Drilling of Additional Exploratory… — more information requested
- Exploration and Production of Hydrocarbons/Natural Gas Through Drilling… — initial checks
- Exploration of Hydrocarbon / Natural Gas through Drilling, Waste-pit and… — initial checks
- Permission for Extraction / Production of Hydrocarbon / Natural Gas from… — more information requested
- Permission for Extraction / Production of Hydrocarbon / Natural Gas from… — more information requested
- Exploration & Production of Hydrocarbon / Natural Gas through Drilling… — initial checks
15 Oil and Natural Gas Corporation (ONGC) projects in South Tripura
All 243 Oil and Natural Gas Corporation (ONGC) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.