Quick answers
What is this project?
Tripura Oil & Gas Exploration Block Aa Onn 2002 1 Nelp IV Proposed for Diversion of 2.036 Hact. Forest Land for Drill Site, Waste Pit, Drill Site Accommodation, Tsr Camp for Location Called Dev 37a is a proposed mining project in Baramura Deotamura R.F, Santirbazar, South Tripura, Tripura. The site covers 5 acres.
Who is building it?
The applicant is Jubilant Oil and Gas PVT LTD.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Baramura Deotamura R.F, Santirbazar, South Tripura, Tripura.
How big is it?
It has a stated cost of ₹25 crore; a site of 5 acres and 5 acres (2 ha) of forest land.
When was it filed?
The application was filed on 25 Apr 2023.
Project details
| Status | More information requested |
|---|---|
| Status since | 18 Nov 2026 |
| Application filed | 25 Apr 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Jubilant Oil and Gas PVT LTD |
| Land area | 5 acres (2 ha) |
| Forest land | 5 acres (2 ha) |
| Project cost | ₹25 crore |
| Village / locality | Baramura Deotamura R.F |
| Taluk / tehsil | Santirbazar |
| District | South Tripura |
| State | Tripura |
| Location from | Site boundary on record |
| Our reference | WID-TR-00188 |
In context
26 applications in South Tripura since January 2022 are in the same category (Mining): 6 approved, 17 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5 acres, this one is smaller than 62% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Baramura Deotamura R.F, Santirbazar, South Tripura, Tripura. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tripura Oil and Gas Exploration Block AA-ONN-2002/1 NELP-IV (Jubilant Oil &… — in-principle approval, conditions pending, 500 m away
- "diversion of Forest Land for the Constriction of Road From Kowaifung… — more information requested, 2.1 km away
- Diversion of Forest Land for the Upgradation of the Santirbazar to Karbook… — under forest review, 2.9 km away
- Diversion Additonal Forest Land for Resettlement of Bru Migrants and Approach… — forest land use approved, 7.3 km away
- Field Development for setting up of Surface Facilities, Group Gathering… — cleared for impact study, 8.7 km away
- Field Development for setting up of Surface Facilities, Group Gathering… — cleared for impact study, 8.7 km away
- Forest Diversion Proposal for oil & gas well Drilling at Loc. OSTA located… — lapsed, 9.1 km away
- Diversion of 6.755 Ha Forest Land in the Approach Road for Construction of Oil… — forest land use approved, 9.1 km away
More from Jubilant Oil and Gas PVT LTD in South Tripura
- Field Development for setting up of Surface Facilities, Group Gathering… — cleared for impact study
- Tripura Oil and Gas Exploration Block AA-ONN-2002/1 NELP-IV (Jubilant Oil &… — in-principle approval, conditions pending
- Field Development for setting up of Surface Facilities, Group Gathering… — cleared for impact study
4 Jubilant Oil and Gas projects in South Tripura
All 5 Jubilant Oil and Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.