Quick answers
What is Industrial project by Neutrawell Healthcare Pvt. Ltd.?
This approved industrial project by Neutrawell Healthcare Pvt. Ltd. is in Central Hop Town, Vikas Nagar, Dehradun, Uttarakhand. The site covers 0.1 acres.
Who is building it?
The applicant is Neutrawell Healthcare Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Oct 2023), as of 27 Nov 2026.
Where is it?
In Central Hop Town, Vikas Nagar, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹1.5 crore and a site of 0.1 acres.
When was it filed?
The application was filed on 27 Oct 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Oct 2023 |
| Application filed | 27 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Neutrawell Healthcare Private Limited |
| Land area | 400 m² |
| Project cost | ₹1.5 crore |
| Village / locality | Central Hop Town |
| Taluk / tehsil | Vikas Nagar |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00071 |
In context
63 applications in Dehradun since January 2022 are in the same category (Industry): 57 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.1 acres, this one is smaller than 98% of them.
79 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Central Hop Town, Vikas Nagar, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Proposed Central Hope Town Sand, Bajri and Boulders Mining in Swarna River… — environmental approval granted, 200 m away
- Environmental Clearance for proposed expansion of existing unit by M/s Intas… — environmental approval granted, 300 m away
- Environmental Clearance for proposed expansion of existing Pharmaceutical… — environmental approval granted, 300 m away
- Environmental Clearance for Proposed Installation of Dryer in Biomass… — more information requested, 350 m away
- Proposed manufacturing of Reprocessed Plastic Granules with capacity 980MT/Per… — environmental approval granted, 350 m away
- Environmental Clearance for Expansion of Existing Manufacturing Unit by M/s… — environmental approval granted, 500 m away
- Craftsmen Graphics — environmental approval granted, 600 m away
- Environmental Clearance for Installation of Thermic Fluid Heater in Existing… — environmental approval granted, 650 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.