Quick answers
What is this project?
Environmental Clearance for Expansion of Existing Manufacturing Unit by M/s Dixon Technologies India Limited at Khasra no. 1050, Central Hope Town, Industrial Area, Vikasnagar, Dehradun, Uttarakhand is an approved industrial building project in Central Hop Town, Vikas Nagar, Dehradun, Uttarakhand. The site covers 3.7 acres.
Who is building it?
The applicant is Dixon Technologies India LTD..
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 21 Feb 2025), as of 27 Nov 2026.
Where is it?
In Central Hop Town, Vikas Nagar, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹27.3 crore and a site of 3.7 acres.
When was it filed?
The application was filed on 3 Feb 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 21 Feb 2025 |
| Application filed | 3 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Dixon Technologies India LTD. |
| Use | Industrial |
| Land area | 3.7 acres (1.5 ha) |
| Project cost | ₹27.3 crore |
| Village / locality | Central Hop Town |
| Taluk / tehsil | Vikas Nagar |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00772 |
In context
165 applications in Dehradun since January 2022 are in the same category (Buildings & townships): 107 approved, 43 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.7 acres, this one is larger than 71% of them.
82 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Central Hop Town, Vikas Nagar, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for proposed expansion of existing unit by M/s Intas… — environmental approval granted, 350 m away
- Environmental Clearance for proposed expansion of existing Pharmaceutical… — environmental approval granted, 350 m away
- Environmental Clearance for Proposed Installation of Dryer in Biomass… — more information requested, 450 m away
- Hasanpur Malukchand Nala Sand, Bajri & Boulder (RBM) Project — environmental approval granted, 500 m away
- Industrial project by Neutrawell Healthcare Pvt. Ltd. — environmental approval granted, 500 m away
- Proposed manufacturing of Reprocessed Plastic Granules with capacity 980MT/Per… — environmental approval granted, 550 m away
- Alexia Panels — environmental approval granted, 600 m away
- Craftsmen Graphics — environmental approval granted, 700 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.