Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Oct 2023 |
| Application filed | 12 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | M/S Shri Puran Singh Majila |
| Land area | 27.7 acres (11.2 ha) |
| Project cost | ₹75 lakh |
| Village / locality | Pangchoura |
| Taluk / tehsil | Kanda |
| District | Bageshwar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00087 |
In context
144 applications in Bageshwar since January 2022 are in the same category (Mining): 125 approved, 6 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 27.7 acres, this one is larger than 83% of them.
No other mining lease on record is within 500 m of this site; 19 have applied within 5 km.
Where it is
Pangchoura, Kanda, Bageshwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kandekanyal, Vashudev and Bakhet Soapstone Mining Project — cleared for impact study, 1.7 km away
- Musyoli Soapstone Mining Project — environmental approval granted, 1.9 km away
- Musyoli Soapstone Mining Project — cleared for impact study, 1.9 km away
- Kanda G.O.V. ( Pumping )water Supply Scheme — lapsed, 2.5 km away
- Chiphalete Pli Chak Titoli Soapstone Mining Project — cleared for impact study, 2.6 km away
- Chiphalete Pli Chak Titoli Soapstone Mining Project — lapsed, 2.6 km away
- Sasola Soapstone Mining Project — environmental approval granted, 2.9 km away
- khunoli Thaklad Soapstone Deposit — environmental approval granted, 2.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.