One of 2 filings for this project. The project's main page, with every filing and where each stands: Musyoli Soapstone Mining Project
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 21 Mar 2024 |
| Application filed | 18 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Som Mines |
| Land area | 13.8 acres (5.6 ha) |
| Project cost | ₹45 lakh |
| Village / locality | Musyoli |
| Taluk / tehsil | Bageshwar |
| District | Bageshwar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00445 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 Sept 2024 | Environmental approval granted | 13.8 acres | ₹45 lakh |
| Early planning filed 18 Feb 2024 (this page) | Cleared for impact study | 13.8 acres | ₹45 lakh |
In context
144 applications in Bageshwar since January 2022 are in the same category (Mining): 125 approved, 6 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 13.8 acres, this one is larger than 58% of them.
No other mining lease on record is within 500 m of this site; 30 have applied within 5 km.
Where it is
Musyoli, Bageshwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Musyoli Soapstone Mining Project — environmental approval granted, 0 m away
- Baitouli Soapstone Mining Project — environmental approval granted, 1.4 km away
- Baitouli Soapstone Mining Project — cleared for impact study, 1.4 km away
- Simkhet/Gairtoli Soapstone Mine — environmental approval granted, 1.7 km away
- Simkhet/Gairtoli Soapstone Mine — lapsed, 1.7 km away
- Mayoo Moosa Soapstone Mining Project — environmental approval granted, 1.7 km away
- khunoli Thaklad Soapstone Deposit — environmental approval granted, 1.7 km away
- Pangchora Soapstone Mining Project — environmental approval granted, 1.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.