What is Developing? Open the mapMap

Cleared for impact studyIndustry · Hardwar, Uttarakhand

Proposed Expansion in Manufacturing of M.S. Billets and Rolling Mills products by M/s Radiant Bar (P) Limited

Proposed Expansion in Manufacturing of M.S. Billets and Rolling Mills products by M/s Radiant Bar (P) Limited is a proposed industrial project in Khempur, Roorkee, Hardwar, Uttarakhand. The site covers 6.2 acres. Its stated project cost is ₹7.2 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 16 Jun 2023).

See it on the live map All projects in Hardwar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion in Manufacturing of M.S. Billets and Rolling Mills products by M/s Radiant Bar (P) Limited is a proposed industrial project in Khempur, Roorkee, Hardwar, Uttarakhand. The site covers 6.2 acres.

Who is building it?

The applicant is Muhammad Ibraheem.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 16 Jun 2023), as of 27 Nov 2026.

Where is it?

In Khempur, Roorkee, Hardwar, Uttarakhand.

How big is it?

It has a stated cost of ₹7.2 crore and a site of 6.2 acres.

When was it filed?

The application was filed on 16 Jun 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion in Manufacturing of M.S. Billets and Rolling Mills products by M/s…

Project details

StatusCleared for impact study
Status since16 Jun 2023
Application filed16 Jun 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantMuhammad Ibraheem
Land area6.2 acres (2.5 ha)
Project cost₹7.2 crore
Village / localityKhempur
Taluk / tehsilRoorkee
DistrictHardwar
StateUttarakhand
Location fromSite boundary on record
Our referenceWID-UK-00110

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 29 Nov 2023Environmental approval granted6.2 acres₹7.2 crore
Early planning filed 16 Jun 2023 (this page)Cleared for impact study6.2 acres₹7.2 crore

In context

22 applications in Hardwar since January 2022 are in the same category (Industry): 17 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 1 months from filing to approval. At 6.2 acres, this one is smaller than 77% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Khempur, Roorkee, Hardwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.