What is Developing? Open the mapMap

Under environmental reviewPower · Hardwar, Uttarakhand

7.5 MW co-generation thermal power plant at Khedi Mubarakpur, Tehsil Laksar, Disfrict Haridwar

7.5 MW co-generation thermal power plant at Khedi Mubarakpur, Tehsil Laksar, Disfrict Haridwar is a proposed power project in Kherimubarakpur, Laksar, Hardwar, Uttarakhand. The site covers 15.3 acres. Its stated project cost is ₹61 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 19 Sept 2026).

See it on the live map All projects in Hardwar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

7.5 MW co-generation thermal power plant at Khedi Mubarakpur, Tehsil Laksar, Disfrict Haridwar is a proposed power project in Kherimubarakpur, Laksar, Hardwar, Uttarakhand. The site covers 15.3 acres.

Who is building it?

The applicant is JK Tyre & industries limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Kherimubarakpur, Laksar, Hardwar, Uttarakhand.

How big is it?

It has a stated cost of ₹61 crore and a site of 15.3 acres.

When was it filed?

The application was filed on 28 May 2026.

Project details

StatusUnder environmental review
Status since19 Sept 2026
Application filed28 May 2026
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorPower
ApplicantJK Tyre & industries limited
Land area15.3 acres (6.2 ha)
Project cost₹61 crore
Village / localityKherimubarakpur
Taluk / tehsilLaksar
DistrictHardwar
StateUttarakhand
Location fromSite boundary on record
Our referenceWID-UK-00844

In context

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kherimubarakpur, Laksar, Hardwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.