One of 2 filings for this project. The project's main page, with every filing and where each stands: Chirang Soapstone Mining Project
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 10 Oct 2023 |
| Application filed | 10 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Gopal Chauhan |
| Land area | 12 acres (4.9 ha) |
| Project cost | ₹45 lakh |
| Village / locality | Chirang |
| Taluk / tehsil | Bageshwar |
| District | Bageshwar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00120 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Feb 2024 | Environmental approval granted | 12 acres | ₹45 lakh |
| Early planning filed 10 Oct 2023 (this page) | Cleared for impact study | 12 acres | ₹45 lakh |
In context
144 applications in Bageshwar since January 2022 are in the same category (Mining): 125 approved, 6 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12 acres, this one is smaller than 52% of them.
No other mining lease on record is within 500 m of this site; 24 have applied within 5 km.
Where it is
Chirang, Bageshwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Chirang Soapstone Mining Project — environmental approval granted, 0 m away
- Dewalchaura G.O.V.(Pumping )water Supply Scheme — more information requested, 700 m away
- Tuper Tok Binsar Soapstone Mining Project — environmental approval granted, 900 m away
- Tuper Tok Binsar Soapstone Mining Project — cleared for impact study, 900 m away
- Khuldaudi Soapstone Mining Project — environmental approval granted, 1 km away
- Khuldaudi Soapstone Mining Project — cleared for impact study, 1 km away
- Khuldori Soapstone Deposit — environmental approval granted, 1.3 km away
- Karuli Soapstone Mining Project — environmental approval granted, 1.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.