Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 19 Mar 2024 |
| Application filed | 12 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jai Shri Hari Soapstone Chirang |
| Land area | 8.9 acres (3.6 ha) |
| Project cost | ₹45 lakh |
| Village / locality | Chirang |
| Taluk / tehsil | Bageshwar |
| District | Bageshwar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00287 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 Jan 2024 (this page) | Environmental approval granted | 8.9 acres | ₹45 lakh |
| Early planning filed 3 Nov 2022 | Cleared for impact study | 8.9 acres | ₹45 lakh |
In context
144 applications in Bageshwar since January 2022 are in the same category (Mining): 125 approved, 6 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8.9 acres, this one is smaller than 71% of them.
No other mining lease on record is within 500 m of this site; 23 have applied within 5 km.
Where it is
Chirang, Bageshwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tuper Tok Binsar Soapstone Mining Project — cleared for impact study, 0 m away
- Tuper Soapstone Deposit — environmental approval granted, 700 m away
- Tuper Soapstone Deposit — cleared for impact study, 700 m away
- Khuldaudi Soapstone Mining Project — environmental approval granted, 750 m away
- Khuldaudi Soapstone Mining Project — cleared for impact study, 750 m away
- Chirang Soapstone Mining Project — environmental approval granted, 900 m away
- Chirang Soapstone Mining Project — cleared for impact study, 900 m away
- Bhatnikot Soapstone Mining Project — environmental approval granted, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.