Quick answers
What is this project?
(2B+G+8 floor) Integrated office complex Green Building at Dehradun (Uttarakhand) is an approved building project in Nagar Nigam Dehradun, Dehradun, Uttarakhand. The site covers 4.7 acres.
Who is building it?
The applicant is Central Public Works Department.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Apr 2023), as of 27 Nov 2026.
Where is it?
In Nagar Nigam Dehradun, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹234 crore and a site of 4.7 acres.
When was it filed?
The application was filed on 25 Apr 2023.
Project details
| Official title | Construction of (2B+G+8 floor) Integrated office complex Green Building at Dehradun (Uttarakhand) |
|---|---|
| Status | Environmental approval granted |
| Status since | 25 Apr 2023 |
| Application filed | 25 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Central Public Works Department |
| Land area | 4.7 acres (1.9 ha) |
| Project cost | ₹234 crore |
| Village / locality | Nagar Nigam Dehradun |
| Taluk / tehsil | Dehradun |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00123 |
In context
165 applications in Dehradun since January 2022 are in the same category (Buildings & townships): 107 approved, 43 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.7 acres, this one is larger than 77% of them.
28 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nagar Nigam Dehradun, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Atulyam Origine by East Canal Realtors — under environmental review, 500 m away
- Environmental Clearance for proposed hospital facility by Altrus Healthcare (A… — environmental approval granted, 500 m away
- Environmental Clearance for Proposed Modification & Expansion of Existing… — environmental approval granted, 550 m away
- Environmental Clearance for Assaying & Hallmarking Laboratory including Green… — environmental approval granted, 900 m away
- A.S. Assaying and Hallmarking Centre — environmental approval granted, 950 m away
- Environmental Clearance for Proposed Modification & Expansion of Existing… — environmental approval granted, 1.5 km away
- Four Lane Elevated Road along Bindal River from Haridwar Bypass Road (NH-72)… — lapsed, 2 km away
- Four Lane Elevated Road along Bindal River from Haridwar Bypass Road (NH-72)… — lapsed, 2 km away
More from Central Public Works Department in Dehradun
- PM Shri Maths and Vocational Lab — lapsed
All 26 Central Public Works Department projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.