Quick answers
What is this project?
Environmental Clearance for Proposed Modification & Expansion of Existing Hotel Facility by M/s Hotel JRJ is an approved hotel project in Nagar Nigam Dehradun, Dehradun, Uttarakhand. The site covers 0.2 acres.
Who is building it?
The applicant is HOTel jrj.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Nov 2024), as of 27 Nov 2026.
Where is it?
In Nagar Nigam Dehradun, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹67 lakh and a site of 0.2 acres.
When was it filed?
The application was filed on 10 Oct 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Nov 2024 |
| Application filed | 10 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | HOTel jrj |
| Use | Hotel |
| Land area | 700 m² |
| Project cost | ₹67 lakh |
| Village / locality | Nagar Nigam Dehradun |
| Taluk / tehsil | Dehradun |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00272 |
In context
165 applications in Dehradun since January 2022 are in the same category (Buildings & townships): 107 approved, 43 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.2 acres, this one is smaller than 93% of them.
28 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nagar Nigam Dehradun, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- A.S. Assaying and Hallmarking Centre — environmental approval granted, 400 m away
- Environmental Clearance for Assaying & Hallmarking Laboratory including Green… — environmental approval granted, 450 m away
- (2B+G+8 floor) Integrated office complex Green Building at Dehradun… — environmental approval granted, 550 m away
- Environmental Clearance for proposed hospital facility by Altrus Healthcare (A… — environmental approval granted, 900 m away
- Atulyam Origine by East Canal Realtors — under environmental review, 1000 m away
- Premsukh Hospital & Dialysis Centre — environmental approval granted, 1.4 km away
- Environmental Clearance for Proposed Modification & Expansion of Existing… — environmental approval granted, 1.6 km away
- Four Lane Elevated Road along Bindal River from Haridwar Bypass Road (NH-72)… — lapsed, 1.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.