Environmental approval grantedBuildings & townships · Dehradun, Uttarakhand

Environmental Clearance for Installation of Thermic Fluid Heater & Boiler in Existing Sweets & Namkeen making unit by M/s Anandam Sweets Private Limited

Environmental Clearance for Installation of Thermic Fluid Heater & Boiler in Existing Sweets & Namkeen making unit by M/s Anandam Sweets Private Limited is an approved industrial building project in Nagar Nigam Dehradun, Dehradun, Uttarakhand. The site covers 0.4 acres. Its stated project cost is ₹68 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 20 Sept 2024).

See it on the live map All projects in Dehradun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Environmental Clearance for Installation of Thermic Fluid Heater & Boiler in Existing Sweets & Namkeen making unit by M/s Anandam Sweets Private Limited is an approved industrial building project in Nagar Nigam Dehradun, Dehradun, Uttarakhand. The site covers 0.4 acres.

Who is building it?

The applicant is Anandam Sweets Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 20 Sept 2024), as of 27 Nov 2026.

Where is it?

In Nagar Nigam Dehradun, Dehradun, Uttarakhand.

How big is it?

It has a stated cost of ₹68 lakh and a site of 0.4 acres.

When was it filed?

The application was filed on 1 Aug 2024.

Project details

StatusEnvironmental approval granted
Status since20 Sept 2024
Application filed1 Aug 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantAnandam Sweets Private Limited
UseIndustrial
Land area1,600 m²
Project cost₹68 lakh
Village / localityNagar Nigam Dehradun
Taluk / tehsilDehradun
DistrictDehradun
StateUttarakhand
Location fromSite boundary on record
Our referenceWID-UK-00280

In context

165 applications in Dehradun since January 2022 are in the same category (Buildings & townships): 107 approved, 43 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.4 acres, this one is smaller than 84% of them.

25 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Nagar Nigam Dehradun, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.