Quick answers
What is Premsukh Hospital & Dialysis Centre?
Premsukh Hospital & Dialysis Centre is an approved industrial project in Nagar Nigam Dehradun, Dehradun, Uttarakhand. The site covers 0.1 acres.
Who is building it?
The applicant is Ashutosh Mathur.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 Feb 2024), as of 27 Nov 2026.
Where is it?
In Nagar Nigam Dehradun, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹8 crore and a site of 0.1 acres.
When was it filed?
The application was filed on 30 Dec 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Feb 2024 |
| Application filed | 30 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Ashutosh Mathur |
| Land area | 400 m² |
| Project cost | ₹8 crore |
| Village / locality | Nagar Nigam Dehradun |
| Taluk / tehsil | Dehradun |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00164 |
In context
63 applications in Dehradun since January 2022 are in the same category (Industry): 57 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.1 acres, this one is smaller than 98% of them.
26 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nagar Nigam Dehradun, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Metro Neo System in Dehradun City — lapsed, 1.2 km away
- A.S. Assaying and Hallmarking Centre — environmental approval granted, 1.2 km away
- Environmental Clearance for Assaying & Hallmarking Laboratory including Green… — environmental approval granted, 1.3 km away
- Environmental Clearance for Proposed Modification & Expansion of Existing… — environmental approval granted, 1.4 km away
- Expansion Project of Shri Mahant Indresh Hospital unit of Shri Guru Ram Rai… — environmental approval granted, 1.5 km away
- Manufacturing of Toughened Glass by Sh. Alimuddin at C-6, Industrial Estate,… — environmental approval granted, 1.5 km away
- Environmental Clearance for Installation of Thermic Fluid Heater & Boiler in… — environmental approval granted, 1.6 km away
- Vihaan Hospitality — environmental approval granted, 1.7 km away