Quick answers
What is this project?
"DIYURI SAND, BAJRI AND BOULDERS MINING IN LADHIYA RIVER" AT KHASRA NO 4546, 4550, VILLAGE- DIYURI, TEHSIL & DISTRICT- CHAMPAWAT- UTTARAKHAND by SHRI SURAJ SHARMA is an approved mining project in Dayuri, Poornagiri, Champawat, Uttarakhand. The site covers 4.3 acres.
Who is building it?
The applicant is Sooraj Sharma.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 Sept 2024), as of 27 Nov 2026.
Where is it?
In Dayuri, Poornagiri, Champawat, Uttarakhand.
How big is it?
It has a stated cost of ₹1 crore and a site of 4.3 acres.
When was it filed?
The application was filed on 20 Feb 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Sept 2024 |
| Application filed | 20 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sooraj Sharma |
| Land area | 4.3 acres (1.8 ha) |
| Project cost | ₹1 crore |
| Village / locality | Dayuri |
| Taluk / tehsil | Poornagiri |
| District | Champawat |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00341 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 8 Nov 2024 | Returned to applicant | 4.3 acres | ₹1 crore |
| New project filed 20 Feb 2024 (this page) | Environmental approval granted | 4.3 acres | ₹1 crore |
In context
24 applications in Champawat since January 2022 are in the same category (Mining): 17 approved, 7 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.3 acres, this one is larger than 58% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Dayuri, Poornagiri, Champawat, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "DIYURI SAND, BAJRI AND BOULDERS MINING IN LADHIYA RIVER" AT KHASRA NO 4546,… — returned to applicant, 0 m away
- Project: Proposed Diyuri-2 Sand, Bajri and Boulders Mining in Ladhiya River… — environmental approval granted, 2.6 km away
- Proposed RBM (Sand, Bajri and Boulders) mining project over an area of 0.174… — initial checks, 3.1 km away
- Sand Bajri Boulder Mining Project — environmental approval granted, 3.1 km away
- Construction of Brijnagar to Aamkhark Motor Road in Champawat district — under wildlife review, 3.3 km away
- Construction of Brijnagar to Aamkhark Motor Road in Champawat district — under wildlife review, 3.4 km away
- Construction of Brijnagar to Aamkhark Motor Road in Champawat district — more information requested, 3.4 km away
- Sand, Bajri & Boulder Deposit (Area – 1.092 Ha) — cleared for impact study, 3.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.