Quick answers
What is this project?
Environmental Clearance for Existing Group Housing Project by M/s Sumeru Infrastructures is a lapsed building project in East Haf Town, Vikas Nagar, Dehradun, Uttarakhand. The site covers 3.8 acres.
Who is building it?
The applicant is Sumeru Infrastructures.
Has it been approved?
No. The application was lapsed on 8 May 2025, so it is no longer under consideration.
Where is it?
In East Haf Town, Vikas Nagar, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹26.2 crore and a site of 3.8 acres.
When was it filed?
The application was filed on 7 May 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 8 May 2025 |
| Application filed | 7 May 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Sumeru Infrastructures |
| Land area | 3.8 acres (1.6 ha) |
| Project cost | ₹26.2 crore |
| Village / locality | East Haf Town |
| Taluk / tehsil | Vikas Nagar |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site area on record |
| Our reference | WID-UK-00364 |
In context
165 applications in Dehradun since January 2022 are in the same category (Buildings & townships): 107 approved, 43 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.8 acres, this one is larger than 73% of them.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
East Haf Town, Vikas Nagar, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mehuwala Cluster Water Supply Scheme (Peri Urban) Funded by World Bank — lapsed, 2.8 km away
- Mehuwala Cluster Water Supply Scheme (Peri Urban) Funded by World Bank — lapsed, 2.8 km away
- Mehuwala Cluster Water Supply Scheme (Peri Urban) Funded by World Bank — lapsed, 2.8 km away
- Mehuwala Cluster Water Supply Scheme (Peri Urban) Funded by World Bank — lapsed, 2.8 km away
- Mehuwala Cluster Water Supply Scheme (Peri Urban) Funded by World Bank — lapsed, 2.8 km away
- Mehuwala Cluster Water Supply Scheme (Peri Urban) Funded by World Bank — more information requested, 2.9 km away
- Sand, Bajri& Boulder (RBM) Deposit — environmental approval granted, 4 km away
- Sand, Bajri& Boulder (RBM) Deposit — cleared for impact study, 4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.