Quick answers
What is this project?
Mehuwala Cluster Water Supply Scheme (Peri Urban) Funded by World Bank is a lapsed pipeline project in Chandrabani, Dehradun, Uttarakhand. It seeks 1 acre of forest land.
Who is building it?
The applicant is Vishal.
Has it been approved?
No. The application was lapsed on 18 Jul 2023, so it is no longer under consideration.
Where is it?
In Chandrabani, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹164 crore and 4,000 m² of forest land.
When was it filed?
The application was filed on 21 Jan 2023.
Project details
| Official title | Construction of Mehuwala Cluster Water Supply Scheme (Peri Urban) Funded by World Bank |
|---|---|
| Status | Lapsed |
| Status since | 18 Jul 2023 |
| Application filed | 21 Jan 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Vishal |
| Forest land | 4,000 m² |
| Project cost | ₹164 crore |
| Village / locality | Chandrabani |
| Taluk / tehsil | Dehradun |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-01581 |
In context
7 applications in Dehradun since January 2022 are in the same category (Pipelines): 0 approved, 2 filed or under review, and 5 withdrawn, lapsed or rejected.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chandrabani, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mehuwala Cluster Water Supply Scheme (Peri Urban) Funded by World Bank — lapsed, 0 m away
- Mehuwala Cluster Water Supply Scheme (Peri Urban) Funded by World Bank — lapsed, 0 m away
- Mehuwala Cluster Water Supply Scheme (Peri Urban) Funded by World Bank — lapsed, 0 m away
- Mehuwala Cluster Water Supply Scheme (Peri Urban) Funded by World Bank — lapsed, 0 m away
- Mehuwala Cluster Water Supply Scheme (Peri Urban) Funded by World Bank — more information requested, 100 m away
- Industrial project by Progressive Analytical & Research Laboratory Pvt. Ltd. — environmental approval granted, 2.7 km away
- Manufacturing of Injectables (Vials/Ampules) at Khasra No. 167, 168, 166 &… — environmental approval granted, 2.7 km away
- Environmental Clearance for Existing Group Housing Project by M/s Sumeru… — lapsed, 2.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.