Quick answers
What is this project?
Manufacturing of Injectables (Vials/Ampules) at Khasra No. 167, 168, 166 & 172, Mohabewala Industrial Area, Dehradun by M/s Windlas Biotech Limited Plant-5 is an approved industrial project in Mohebbeywala, Dehradun, Uttarakhand. The site covers 0.5 acres.
Who is building it?
The applicant is Windlas Biotech Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 19 Sept 2024), as of 27 Nov 2026.
Where is it?
In Mohebbeywala, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹54.2 crore and a site of 0.5 acres.
When was it filed?
The application was filed on 7 Aug 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 19 Sept 2024 |
| Application filed | 7 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Windlas Biotech Limited |
| Land area | 2,200 m² |
| Project cost | ₹54.2 crore |
| Village / locality | Mohebbeywala |
| Taluk / tehsil | Dehradun |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00388 |
In context
63 applications in Dehradun since January 2022 are in the same category (Industry): 57 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.5 acres, this one is larger than 55% of them.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mohebbeywala, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The Shiva Continental — environmental approval granted, 250 m away
- Transfer of 0.1166 Hectares of Forest Land to Uttarakhand Jal Sansthan… — forest land use approved, 700 m away
- Subhas Nagar Bharuwala, Grant water supply scheme — lapsed, 1.1 km away
- Industrial project by Progressive Analytical & Research Laboratory Pvt. Ltd. — environmental approval granted, 1.4 km away
- Mehuwala Cluster Water Supply Scheme (Peri Urban) Funded by World Bank — more information requested, 2.6 km away
- Diversion of Forest Land for Slope Stabilization Along the 4 Lane Ganeshpur —… — forest land use approved, 2.6 km away
- Mehuwala Cluster Water Supply Scheme (Peri Urban) Funded by World Bank — lapsed, 2.7 km away
- Mehuwala Cluster Water Supply Scheme (Peri Urban) Funded by World Bank — lapsed, 2.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.