Quick answers
What is Subhas Nagar Bharuwala, Grant water supply scheme?
Subhas Nagar Bharuwala, Grant water supply scheme is a lapsed water and irrigation project in Bharuwala, Dehradun, Uttarakhand. It seeks 0.4 acres of forest land.
Who is building it?
The applicant is Construction Division Uttarakhand Peyjal Nigam Mussoorie.
Has it been approved?
No. The application was lapsed on 21 Nov 2026, so it is no longer under consideration.
Where is it?
In Bharuwala, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹27.5 crore and 1,740 m² of forest land.
When was it filed?
The application was filed on 13 Oct 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 21 Nov 2026 |
| Application filed | 13 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Construction Division Uttarakhand Peyjal Nigam Mussoorie |
| Forest land | 1,740 m² |
| Project cost | ₹27.5 crore |
| Village / locality | Bharuwala |
| Taluk / tehsil | Dehradun |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-01273 |
In context
16 applications in Dehradun since January 2022 are in the same category (Water & irrigation): 5 approved, 6 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2.8 years from filing to approval.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bharuwala, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of 0.1166 Hectares of Forest Land to Uttarakhand Jal Sansthan… — forest land use approved, 550 m away
- The Shiva Continental — environmental approval granted, 800 m away
- Manufacturing of Injectables (Vials/Ampules) at Khasra No. 167, 168, 166 &… — environmental approval granted, 1.1 km away
- Industrial project by Progressive Analytical & Research Laboratory Pvt. Ltd. — environmental approval granted, 1.5 km away
- Diversion of Forest Land for Slope Stabilization Along the 4 Lane Ganeshpur —… — forest land use approved, 3.1 km away
- Proposed Hotel Building by Surya Developers at Kh. No. 161, 162 Ka, 162 Kha,… — environmental approval granted, 3.2 km away
- Mehuwala Cluster Water Supply Scheme (Peri Urban) Funded by World Bank — more information requested, 3.6 km away
- Mehuwala Cluster Water Supply Scheme (Peri Urban) Funded by World Bank — lapsed, 3.7 km away
More from Construction Division Uttarakhand Peyjal Nigam Mussoorie in Dehradun
- Mussoorie Sewerage Scheme(Camel back Zone STP) — lapsed
- Motidhar Paniyala Pumping Water Supply Scheme — more information requested
- Motidhar Paniyala Pumping water supply scheme — lapsed
- Krishna Nagar Water Supply Scheme — lapsed
All 5 Construction Division Uttarakhand Peyjal Nigam Mussoorie projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.