Quick answers
What is this project?
Proposed Malt based distillery plant of capacity 30 KLD promoted by MBev Spirits Private Limited is a lapsed industrial project in Mahuakheraganj, Kashipur, Udham Singh Nagar, Uttarakhand. The site covers 15 acres.
Who is building it?
The applicant is Microbrew Bistro PVT. LTD..
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Mahuakheraganj, Kashipur, Udham Singh Nagar, Uttarakhand.
How big is it?
It has a stated cost of ₹195 crore and a site of 15 acres.
When was it filed?
The application was filed on 13 Feb 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 13 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Other |
| Sector | Industry |
| Applicant | Microbrew Bistro PVT. LTD. |
| Land area | 15 acres (6.1 ha) |
| Project cost | ₹195 crore |
| Village / locality | Mahuakheraganj |
| Taluk / tehsil | Kashipur |
| District | Udham Singh Nagar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00416 |
In context
50 applications in Udham Singh Nagar since January 2022 are in the same category (Industry): 39 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 44 days from filing to approval. At 15 acres, this one is larger than 64% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mahuakheraganj, Kashipur, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Production of Resin Derivatives in Existing MDF… — environmental approval granted, 1.3 km away
- Common Solid Waste Management Facility [Sanitary Landfill] at Plot No. 397,… — lapsed, 1.5 km away
- Common Solid Waste Management Facility [Sanitary Landfill] at Plot No. 397,… — cleared for impact study, 1.5 km away
- Environment Clearance for proposed manufacturing unit of Adhesive/Glue by M/s… — environmental approval granted, 1.9 km away
- Affordable Housing Project Under Pmay — cleared for impact study, 2 km away
- Environmental Clearance for Proposed Intermediates of Bulk Drugs Manufacturing… — environmental approval granted, 2.1 km away
- Environmental Clearance for Proposed Intermediates of Bulk Drugs Manufacturing… — cleared for impact study, 2.1 km away
- Proposed change in raw material mix for the production of 600 KLD of Rectified… — initial checks, 5.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.