Quick answers
What is this project?
Common Solid Waste Management Facility [Sanitary Landfill] at Plot No. 397, Shri Developers Industrial Estate, Mahuakheraganj, Tehsil – Kashipur, Dist.-Udham Singh Nagar, Uttarakhand is a proposed waste management project in Mahuakheraganj, Kashipur, Udham Singh Nagar, Uttarakhand. The site covers 1 acre.
Who is building it?
The applicant is Nagar Palika Parishad Mahuakhera Ganj.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 21 Oct 2024), as of 27 Nov 2026.
Where is it?
In Mahuakheraganj, Kashipur, Udham Singh Nagar, Uttarakhand.
How big is it?
It has a stated cost of ₹1.8 crore and a site of 1 acre.
When was it filed?
The application was filed on 10 May 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 21 Oct 2024 |
| Application filed | 10 May 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Waste management |
| Applicant | Nagar Palika Parishad Mahuakhera Ganj |
| Land area | 3,900 m² |
| Project cost | ₹1.8 crore |
| Village / locality | Mahuakheraganj |
| Taluk / tehsil | Kashipur |
| District | Udham Singh Nagar |
| State | Uttarakhand |
| Location from | Site area on record |
| Our reference | WID-UK-00518 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 15 May 2026 | Lapsed | 1 acre | ₹1.8 crore |
| Early planning filed 10 May 2024 (this page) | Cleared for impact study | 1 acre | ₹1.8 crore |
In context
6 applications in Udham Singh Nagar since January 2022 are in the same category (Waste management): 3 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mahuakheraganj, Kashipur, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Common Solid Waste Management Facility [Sanitary Landfill] at Plot No. 397,… — lapsed, 0 m away
- Affordable Housing Project Under Pmay — cleared for impact study, 1.1 km away
- Proposed Malt based distillery plant of capacity 30 KLD promoted by MBev… — lapsed, 1.5 km away
- Environmental Clearance for Proposed Intermediates of Bulk Drugs Manufacturing… — environmental approval granted, 2.1 km away
- Environmental Clearance for Proposed Intermediates of Bulk Drugs Manufacturing… — cleared for impact study, 2.1 km away
- Environment Clearance for proposed manufacturing unit of Adhesive/Glue by M/s… — environmental approval granted, 2.6 km away
- Environmental Clearance for Production of Resin Derivatives in Existing MDF… — environmental approval granted, 2.6 km away
- Silt/Sand, Bajri & Boulder (RBM) Mining in Dhela River at Khasra No. 1347/5,… — environmental approval granted, 6.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.