Quick answers
What is this project?
Environmental Clearance for Proposed Expansion of Existing Malt Spirit, Cane juice based Rum & Craft Gin Plant from 6.0 KLD to 10.0 KLD by M/s Himalaya Wine Company Pvt. Ltd is a proposed industrial project in Pachchawala, Kashipur, Udham Singh Nagar, Uttarakhand. The site covers 3.7 acres.
Who is building it?
The applicant is Himalaya Wine Company PVT. LTD..
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 26 Nov 2024), as of 27 Nov 2026.
Where is it?
In Pachchawala, Kashipur, Udham Singh Nagar, Uttarakhand.
How big is it?
It has a stated cost of ₹33 crore and a site of 3.7 acres.
When was it filed?
The application was filed on 7 Oct 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Environmental Clearance for Proposed Expansion of Existing Malt Spirit, Cane juice based…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 26 Nov 2024 |
| Application filed | 7 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Himalaya Wine Company PVT. LTD. |
| Land area | 3.7 acres (1.5 ha) |
| Project cost | ₹33 crore |
| Village / locality | Pachchawala |
| Taluk / tehsil | Kashipur |
| District | Udham Singh Nagar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00501 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 20 Apr 2025 | Environmental approval granted | 3.7 acres | ₹33 crore |
| Early planning filed 7 Oct 2024 (this page) | Cleared for impact study | 3.7 acres | ₹33 crore |
In context
50 applications in Udham Singh Nagar since January 2022 are in the same category (Industry): 39 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 44 days from filing to approval. At 3.7 acres, this one is smaller than 68% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pachchawala, Kashipur, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Proposed Expansion of Existing Malt Spirit, Cane… — environmental approval granted, 0 m away
- Proposed 300 KLPD Grain based Ethanol Plant by M/s DSK Foods Private Limited — environmental approval granted, 300 m away
- Surrender of EC for Proposed 120 KLD Grain Based Ethanol Plant with 3.0 MW… — withdrawn, 350 m away
- Regularization of existing Rolling mill plant for production of 237,600 TPA… — environmental approval granted, 4.7 km away
- Regularization of existing Rolling mill plant for production of 237,600 TPA… — cleared for impact study, 4.7 km away
- Enhancement of MS Ingots/Billets production from 2,04,000 TPA to 3,74,000 TPA… — environmental approval granted, 4.9 km away
- Enhancement of MS Ingots/Billets production from 2,04,000 TPA to 3,74,000 TPA… — cleared for impact study, 4.9 km away
- Noorpur Sand, Bajri & Boulder (RBM) Mining Project — initial checks, 5.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.