What is Developing? Open the mapMap

Environmental approval grantedIndustry · Udham Singh Nagar, Uttarakhand

Amendment in EC of Grain based Ethanol Distillery capacity 300 KLD

Amendment in EC of Grain based Ethanol Distillery capacity 300 KLD is an approved industrial project in Kishanpur, Kichha, Udham Singh Nagar, Uttarakhand. The site covers 10.7 acres. Its stated project cost is ₹408.2 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 14 Aug 2025).

See it on the live map All projects in Udham Singh Nagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Amendment in EC of Grain based Ethanol Distillery capacity 300 KLD is an approved industrial project in Kishanpur, Kichha, Udham Singh Nagar, Uttarakhand. The site covers 10.7 acres.

Who is building it?

The applicant is Maasheetla Ventures Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 14 Aug 2025), as of 27 Nov 2026.

Where is it?

In Kishanpur, Kichha, Udham Singh Nagar, Uttarakhand.

How big is it?

It has a stated cost of ₹408.2 crore and a site of 10.7 acres.

When was it filed?

The application was filed on 7 Jul 2025.

Project details

Official titleAmendment in EC of Grain based Ethanol Distillery capacity 300 KLD along with Co-gen power of 9.0 MW (wherein amendment of fuel as biomass + RDF) at Khasra No. 495, 499, 503, 504, 507 and 512 in village: Kishanpur, Tehsil: Kiccha, District: Udham Singh Nagar, Uttarakhand of M/s Maasheetla Ventures Limited, Unit – Kichha
StatusEnvironmental approval granted
Status since14 Aug 2025
Application filed7 Jul 2025
Approval soughtEnvironmental approval
Application typeAmendment
SectorIndustry
ApplicantMaasheetla Ventures Limited
Land area10.7 acres (4.3 ha)
Project cost₹408.2 crore
Village / localityKishanpur
Taluk / tehsilKichha
DistrictUdham Singh Nagar
StateUttarakhand
Location fromSite boundary on record
Our referenceWID-UK-00594

In context

50 applications in Udham Singh Nagar since January 2022 are in the same category (Industry): 39 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 44 days from filing to approval. At 10.7 acres, this one is larger than 52% of them.

15 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kishanpur, Kichha, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Maasheetla Ventures projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.