Proposed Expansion of Existing Grain-Based Distillery From 300 Kld to 500 Kld Through Addition of 200 Kld (Grain Based) Distillery Plant for Production of Rs/Ena/Aa

Proposed Expansion of Existing Grain-Based Distillery From 300 Kld to 500 Kld Through Addition of 200 Kld (Grain Based) Distillery Plant for Production of Rs/Ena/Aa is a proposed industrial project in Kishanpur, Kichha, Udham Singh Nagar, Uttarakhand. The site covers 12.6 acres. Its stated project cost is ₹647.4 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 1 Oct 2025).

See it on the live map All projects in Udham Singh Nagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion of Existing Grain-Based Distillery From 300 Kld to 500 Kld Through Addition of 200 Kld (Grain Based) Distillery Plant for Production of Rs/Ena/Aa is a proposed industrial project in Kishanpur, Kichha, Udham Singh Nagar, Uttarakhand. The site covers 12.6 acres.

Who is building it?

The applicant is M/S Maa Sheetla Ventures Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 1 Oct 2025), as of 27 Nov 2026.

Where is it?

In Kishanpur, Kichha, Udham Singh Nagar, Uttarakhand.

How big is it?

It has a stated cost of ₹647.4 crore and a site of 12.6 acres.

When was it filed?

The application was filed on 14 Sept 2025.

Project details

Official titleProposed Expansion of Existing Grain-Based Distillery From 300 Kld to 500 Kld Through Addition of 200 Kld (Grain Based) Distillery Plant for Production of Rs/Ena/Aa Along With Co-Gen Power Plant From 9.0 MW (No Change)
StatusCleared for impact study
Status since1 Oct 2025
Application filed14 Sept 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantM/S Maa Sheetla Ventures Limited
Land area12.6 acres (5.1 ha)
Project cost₹647.4 crore
Village / localityKishanpur
Taluk / tehsilKichha
DistrictUdham Singh Nagar
StateUttarakhand
Location fromSite boundary on record
Our referenceWID-UK-00614

In context

50 applications in Udham Singh Nagar since January 2022 are in the same category (Industry): 39 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 44 days from filing to approval. At 12.6 acres, this one is larger than 56% of them.

16 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kishanpur, Kichha, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from M/S Maa Sheetla Ventures Limited in Udham Singh Nagar

All 5 Maa Sheetla Ventures projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.