Quick answers
What is this project?
Amendment in Existing Environmental Clearance for Reduction in Production Capacity by M/S Naari Pharma PVT. LTD is an approved industrial project in Kalyanpur, Kichha, Udham Singh Nagar, Uttarakhand. The site covers 3.1 acres.
Who is building it?
The applicant is Naari Pharma Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Sept 2025), as of 27 Nov 2026.
Where is it?
In Kalyanpur, Kichha, Udham Singh Nagar, Uttarakhand.
How big is it?
It has a stated cost of ₹50 lakh and a site of 3.1 acres.
When was it filed?
The application was filed on 8 Sept 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Sept 2025 |
| Application filed | 8 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Naari Pharma Private Limited |
| Land area | 3.1 acres (1.3 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Kalyanpur |
| Taluk / tehsil | Kichha |
| District | Udham Singh Nagar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00613 |
In context
50 applications in Udham Singh Nagar since January 2022 are in the same category (Industry): 39 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 44 days from filing to approval. At 3.1 acres, this one is smaller than 72% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kalyanpur, Kichha, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed change in product mix for production of additional product i.e., Wet… — initial checks, 2.7 km away
- Environment Clearance for proposed capacity expansion of Refined Silver… — environmental approval granted, 3.3 km away
- Realignment of Rudrapur – Kathgodam section of NH-87 (New NH-109) from Design… — under forest review, 5.4 km away
- Proposed Expansion of Runway, Terminal Building, Apron, Taxiway & allied… — under environmental review, 5.5 km away
- Proposed Expansion of Runway, Terminal Building, Apron, Taxiway & allied… — cleared for impact study, 5.5 km away
- Diversion of Forest Land for Construction of Tarai and Chakpheri Feeder Canals… — more information requested, 7.1 km away
- Expansion In Existing Paper Chemical Manufacturing Unit at Plot no 160/6,… — cleared for impact study, 8.5 km away
- Industrial project by Subham Chemicals Pvt. Ltd. — environmental approval granted, 8.7 km away