Quick answers
What is this project?
Realignment of Rudrapur – Kathgodam section of NH-87 (New NH-109) from Design Ch. 0+000 (exiting 54.050) to Des. Ch: 7.875 (Existing Km 61.550) due to proposed Expansion of Pantnagar Airport (Total length- 7.875 Km) in the State of Uttarakhand on EPC Mode is a proposed road project in Kalyanpur, Kichha, Udham Singh Nagar, Uttarakhand. The site covers 460.8 acres.
Who is building it?
The applicant is National Highway Authority of India.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Kalyanpur, Kichha, Udham Singh Nagar, Uttarakhand.
How big is it?
It has a stated cost of ₹217.4 crore; a site of 460.8 acres and 47.6 acres (19.2 ha) of forest land.
When was it filed?
The application was filed on 31 Oct 2026.
Project details
| Status | Under forest review |
|---|---|
| Status since | 31 Oct 2026 |
| Application filed | 31 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | National Highway Authority of India |
| Land area | 460.8 acres (186.5 ha) |
| Forest land | 47.6 acres (19.2 ha) |
| Project cost | ₹217.4 crore |
| Village / locality | Kalyanpur |
| Taluk / tehsil | Kichha |
| District | Udham Singh Nagar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-02288 |
In context
6 applications in Udham Singh Nagar since January 2022 are in the same category (Roads & highways): 2 approved, 4 filed or under review, and 0 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kalyanpur, Kichha, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Runway, Terminal Building, Apron, Taxiway & allied… — under environmental review, 450 m away
- Proposed Expansion of Runway, Terminal Building, Apron, Taxiway & allied… — cleared for impact study, 450 m away
- Diversion of Forest Land for Construction of Tarai and Chakpheri Feeder Canals… — more information requested, 3.8 km away
- Proposed change in product mix for production of additional product i.e., Wet… — initial checks, 5.4 km away
- Amendment in Existing Environmental Clearance for Reduction in Production… — environmental approval granted, 5.4 km away
- Environment Clearance for proposed capacity expansion of Refined Silver… — environmental approval granted, 5.5 km away
- Expansion In Existing Paper Chemical Manufacturing Unit at Plot no 160/6,… — cleared for impact study, 10.4 km away
- Proposed Integrated Manufacturing Cluster (IMC) at Khurpia Farm, Udham Singh… — environmental approval granted, 10.6 km away
More from National Highway Authority of India in Udham Singh Nagar
3 National Highways Authority of India (NHAI) projects in Udham Singh Nagar
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.