Quick answers
What is this project?
Sand, Bajri and Boulders Mining at Kailash River, Khasra No. 643/2, 644/5, 644/9, 644/3,644/6, Village- Sadhunagar, Tehsil- Sitarganj & District- Udham Singh Nagar, State- Uttarakhand Shri Jalam Singh Area: 4.048 Ha is a withdrawn mining project in Sadhunagar, Sitarganj, Udham Singh Nagar, Uttarakhand. The site covers 10 acres.
Who is building it?
The applicant is Jalam Singh.
Has it been approved?
No. The application was withdrawn on 28 Aug 2025, so it is no longer under consideration.
Where is it?
In Sadhunagar, Sitarganj, Udham Singh Nagar, Uttarakhand.
How big is it?
It has a stated cost of ₹40 lakh and a site of 10 acres.
When was it filed?
The application was filed on 28 Aug 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand, Bajri and Boulders Mining at Kailash River, Khasra No. 643/2, 644/5, 644/9,…
Project details
| Status | Withdrawn |
|---|---|
| Status since | 28 Aug 2025 |
| Application filed | 28 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jalam Singh |
| Land area | 10 acres (4.1 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Sadhunagar |
| Taluk / tehsil | Sitarganj |
| District | Udham Singh Nagar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00634 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 14 Sept 2025 | Environmental approval granted | 10 acres | ₹40 lakh |
| New project filed 28 Aug 2025 (this page) | Withdrawn | 10 acres | ₹40 lakh |
In context
96 applications in Udham Singh Nagar since January 2022 are in the same category (Mining): 70 approved, 13 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 32 days from filing to approval. At 10 acres, this one is larger than 84% of them.
No other mining lease on record is within 500 m of this site; 15 have applied within 5 km.
Where it is
Sadhunagar, Sitarganj, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand, Bajri and Boulders Mining at Kailash River, Khasra No. 643/2, 644/5,… — environmental approval granted, 0 m away
- Proposed Sand, Bajri and Boulders Mining at Kailash River Khasra No. 638/1/6,… — environmental approval granted, 750 m away
- Sadhu Nagar Sand, Bajri and Boulders Mining in Kailash River At Khasra no.… — initial checks, 800 m away
- Sadhu Nagar Sand, Bajri and Boulders Mining in Kailash River At Khasra no.… — cleared for impact study, 800 m away
- Proposed Sand, Bajri and Boulders Mining at Kailash River Khasra No.… — environmental approval granted, 1 km away
- Proposed Sadhu Nagar Sand, Bajri and Boulders Mining at Kailash River At… — environmental approval granted, 1.3 km away
- Sand, Bajri and Boulders Mining in Kailash River" At 65 ग, 67 क, 122 घ & 66 घ,… — withdrawn, 1.3 km away
- Sand, Bajri and Boulders Mining in Kailash River" At 65 ग, 67 क, 122 घ & 66 घ,… — environmental approval granted, 1.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.