Quick answers
What is this project?
Sand, Bajri and Boulders Mining at Kailash River, Khasra No. 643/2, 644/5, 644/9, 644/3,644/6, Village- Sadhunagar, Tehsil- Sitarganj & District- Udham Singh Nagar, State- Uttarakhand Shri Jalam Singh Area: 4.048 Ha is an approved mining project in Sadhunagar, Sitarganj, Udham Singh Nagar, Uttarakhand. The site covers 10 acres.
Who is building it?
The applicant is Jalam Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 1 Oct 2025), as of 27 Nov 2026.
Where is it?
In Sadhunagar, Sitarganj, Udham Singh Nagar, Uttarakhand.
How big is it?
It has a stated cost of ₹40 lakh and a site of 10 acres.
When was it filed?
The application was filed on 14 Sept 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 1 Oct 2025 |
| Application filed | 14 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jalam Singh |
| Land area | 10 acres (4.1 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Sadhunagar |
| Taluk / tehsil | Sitarganj |
| District | Udham Singh Nagar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00803 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 14 Sept 2025 (this page) | Environmental approval granted | 10 acres | ₹40 lakh |
| New project filed 28 Aug 2025 | Withdrawn | 10 acres | ₹40 lakh |
In context
96 applications in Udham Singh Nagar since January 2022 are in the same category (Mining): 70 approved, 13 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 32 days from filing to approval. At 10 acres, this one is larger than 84% of them.
No other mining lease on record is within 500 m of this site; 15 have applied within 5 km.
Where it is
Sadhunagar, Sitarganj, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand, Bajri and Boulders Mining at Kailash River, Khasra No. 643/2, 644/5,… — withdrawn, 0 m away
- Proposed Sand, Bajri and Boulders Mining at Kailash River Khasra No. 638/1/6,… — environmental approval granted, 750 m away
- Sadhu Nagar Sand, Bajri and Boulders Mining in Kailash River At Khasra no.… — initial checks, 800 m away
- Sadhu Nagar Sand, Bajri and Boulders Mining in Kailash River At Khasra no.… — cleared for impact study, 800 m away
- Proposed Sand, Bajri and Boulders Mining at Kailash River Khasra No.… — environmental approval granted, 1 km away
- Proposed Sadhu Nagar Sand, Bajri and Boulders Mining at Kailash River At… — environmental approval granted, 1.3 km away
- Sand, Bajri and Boulders Mining in Kailash River" At 65 ग, 67 क, 122 घ & 66 घ,… — withdrawn, 1.3 km away