Quick answers
What is this project?
Environmental clearance for proposed expansion of existing Synthetic Resins, Hardners & Catalyst, Formaldehyde and Paratoluene Sulphonic Acid Mono-Hydrate manufacturing unit by M/s Forace Speciality Chem Pvt. Ltd is a proposed industrial project in Bhel, Hardwar, Uttarakhand. The site covers 12.6 acres.
Who is building it?
The applicant is Forace Polymers PVT LTD.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Bhel, Hardwar, Uttarakhand.
How big is it?
It has a stated cost of ₹241.9 crore and a site of 12.6 acres.
When was it filed?
The application was filed on 22 Jan 2025.
Project details
| Official title | Environmental clearance for proposed expansion of existing Synthetic Resins, Hardners & Catalyst, Formaldehyde and Paratoluene Sulphonic Acid Mono-Hydrate manufacturing unit along with addition of Ethylene Glycol Di Acetate (EGDA), Triacetin, Dibasic Ester (DBE) and Releasing Agent as new products by M/s Forace Speciality Chem Pvt. Ltd. |
|---|---|
| Status | Returned to applicant |
| Status since | 11 Feb 2025 |
| Application filed | 22 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Forace Polymers PVT LTD |
| Land area | 12.6 acres (5.1 ha) |
| Project cost | ₹241.9 crore |
| Village / locality | Bhel |
| Taluk / tehsil | Hardwar |
| District | Hardwar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00690 |
In context
22 applications in Hardwar since January 2022 are in the same category (Industry): 17 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 1 months from filing to approval. At 12.6 acres, this one is smaller than 55% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhel, Hardwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Change in Product Mix and Fuel by M/S Forace… — environmental approval granted, 0 m away
- Sand, bajri & Boulder (RBM) Deposit. Area : 2.00 Ha — environmental approval granted, 1.4 km away
- Sand, Bajiri & Boulder (RBM) Deposit Area : 2.00 Ha Village-Bajarewala — withdrawn, 1.4 km away
- Sand, bajri & Boulder (RBM) Deposit. Area : 2.00 Ha — returned to applicant, 1.4 km away
- Sand, Bajri and Boulder mining at River Roe, Area- 2.0 ha, Khasra No. 649,… — under wildlife review, 1.4 km away
- Environment Clearance for Proposed PU Foam Manufacturing in existing PU Foam… — initial checks, 3.8 km away
- Environmental Clearance for Proposed Modification in Existing Group Housing… — environmental approval granted, 3.8 km away
- Building project by Cico Polymers PVT LTD — environmental approval granted, 4.1 km away
More from Forace Polymers PVT LTD in Hardwar
- Environmental Clearance for Change in Product Mix and Fuel by M/S Forace… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.