Quick answers
What is this project?
Sand, Bajri and Boulder mining at River Roe, Area- 2.0 ha, Khasra No. 649, Village- Jwalapur, Ranipur, Tehsil- Haridwar, District- Haridwar, State- Uttarakhand is a proposed building project in Jwalapur, Hardwar, Uttarakhand. The site covers 4.9 acres.
Who is building it?
The applicant is Kailash River Bed Minerals LLP.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Jwalapur, Hardwar, Uttarakhand.
How big is it?
It has a stated cost of ₹20 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 25 May 2025.
Project details
| Status | Under wildlife review |
|---|---|
| Status since | 25 May 2025 |
| Application filed | 25 May 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Kailash River Bed Minerals LLP |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Jwalapur |
| Taluk / tehsil | Hardwar |
| District | Hardwar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-02207 |
In context
31 applications in Hardwar since January 2022 are in the same category (Buildings & townships): 8 approved, 21 filed or under review, and 2 withdrawn, lapsed or rejected. At 4.9 acres, this one is smaller than 65% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jwalapur, Hardwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand, bajri & Boulder (RBM) Deposit. Area : 2.00 Ha — environmental approval granted, 0 m away
- Sand, Bajiri & Boulder (RBM) Deposit Area : 2.00 Ha Village-Bajarewala — withdrawn, 0 m away
- Sand, bajri & Boulder (RBM) Deposit. Area : 2.00 Ha — returned to applicant, 0 m away
- Environmental Clearance for Change in Product Mix and Fuel by M/S Forace… — environmental approval granted, 1.4 km away
- Environmental clearance for proposed expansion of existing Synthetic Resins,… — returned to applicant, 1.4 km away
- Environment Clearance for Proposed PU Foam Manufacturing in existing PU Foam… — initial checks, 4.8 km away
- Environmental Clearance for Proposed Modification in Existing Group Housing… — environmental approval granted, 5.1 km away
- Multi-Modal Cargo Terminal under GCT policy, 2022 on Railway land at Pathri… — environmental approval granted, 5.3 km away
More from Kailash River Bed Minerals LLP in Hardwar
- Banjarewala Grant Sand, Bajri & Boulder (RBM) mining project — initial checks
- Sand, Bajri & Boulder (RBM) Deposit — initial checks
- Sand, Bajri & Boulder (RBM) Deposit — initial checks
- Sand, Bajri & Boulder (RBM) Deposit at Village- Navoday Nagar — withdrawn
- Sand, Bajri & Boulder (RBM) Deposit — cleared for impact study
- Sand, bajri & Boulder (RBM) Deposit. Area : 2.00 Ha — environmental approval granted
35 Kailash River Bed Minerals projects in Hardwar
All 142 Kailash River Bed Minerals projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.