Quick answers
What is this project?
Proposed sand, bajri & boulders Mine (Area = 1.0 ha) at Vill. –Patauti, Tehsil- Bazpur, & District– Udham Singh Nagar, Uttarakhand is an approved mining project in Patoti, Bajpur, Udham Singh Nagar, Uttarakhand. The site covers 2.5 acres.
Who is building it?
The applicant is TUSHAR sharma.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 19 Jun 2025), as of 27 Nov 2026.
Where is it?
In Patoti, Bajpur, Udham Singh Nagar, Uttarakhand.
How big is it?
It has a stated cost of ₹42 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 3 May 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 19 Jun 2025 |
| Application filed | 3 May 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | TUSHAR sharma |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹42 lakh |
| Village / locality | Patoti |
| Taluk / tehsil | Bajpur |
| District | Udham Singh Nagar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00699 |
In context
96 applications in Udham Singh Nagar since January 2022 are in the same category (Mining): 70 approved, 13 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 32 days from filing to approval. At 2.5 acres, this one is smaller than 85% of them.
6 other mining leases have applied within 500 m of this site; together with this one they cover 29 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 29 mining leases have applied within 5 km.
Where it is
Patoti, Bajpur, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand, Bajri & Boulder Mining (RBM) in Kosi River" at Khata No. - 25 Khasra… — under environmental review, 200 m away
- Proposed sand, bajri & boulders Mine (Area = 1.403 ha) at Vill. –Patauti,… — environmental approval granted, 250 m away
- Proposed sand, bajri & boulders Mine (Area = 1.403 ha) at Vill. –Patauti,… — withdrawn, 250 m away
- Proposed Sand, Boulder & Bajri Mining Project — environmental approval granted, 400 m away
- Sand, Bajri & Boulder (RBM) Deposit (Area 2.100Ha) — lapsed, 400 m away
- Sand, Bajri & Boulder (RBM) Deposit (Area 2.100Ha) — environmental approval granted, 400 m away
- Sand, Bajri & Boulder (Rbm) Deposit in River Kosi — environmental approval granted, 450 m away
- Proposed sand, bajri & boulders Mine (Area = 1.976 ha) at Vill. -Patauti,… — environmental approval granted, 550 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.