Quick answers
What is this project?
Proposed Expansion of Grain Based Distillery Capacity From 40 Kld to 160 Kld by M/S Uttam Distilleries Limited is an approved industrial project in Ahmadpur Sarwareki, Roorkee, Hardwar, Uttarakhand. The site covers 23.8 acres.
Who is building it?
The applicant is Uttam Distilleries Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 14 Aug 2025), as of 27 Nov 2026.
Where is it?
In Ahmadpur Sarwareki, Roorkee, Hardwar, Uttarakhand.
How big is it?
It has a stated cost of ₹184 crore and a site of 23.8 acres.
When was it filed?
The application was filed on 24 Jun 2025.
Project details
| Official title | Proposed Expansion of Grain Based Distillery Capacity From 40 Kld to 160 Kld Along With Expansion of Co-Gen Power From 3.0 MW to 6.0 MW Within Exsiting Industry Premises at Village: Ahmadpur Grant, Block: Bahadrabad, Tehsil & District: Haridwar (Uttarakhand) by M/S Uttam Distilleries Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 14 Aug 2025 |
| Application filed | 24 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Uttam Distilleries Limited |
| Land area | 23.8 acres (9.6 ha) |
| Project cost | ₹184 crore |
| Village / locality | Ahmadpur Sarwareki |
| Taluk / tehsil | Roorkee |
| District | Hardwar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00797 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 24 Jun 2025 (this page) | Environmental approval granted | 23.8 acres | ₹184 crore |
| Early planning filed 30 Apr 2024 | Cleared for impact study | 23.8 acres | ₹184 crore |
In context
22 applications in Hardwar since January 2022 are in the same category (Industry): 17 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 1 months from filing to approval. At 23.8 acres, this one is larger than 64% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ahmadpur Sarwareki, Roorkee, Hardwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Grain Based Distillery Capacity From 40 Kld to 160 Kld… — cleared for impact study, 0 m away
- Expansion of Group Housing Project "Amrit Aarogyam" — environmental approval granted, 3.9 km away
- Group Housing Project "Amrit Aarogyam" — returned to applicant, 3.9 km away
- Building project by Cico Polymers PVT LTD — environmental approval granted, 4.8 km away
- Proposed Sand, Bajri & Boulder (RBM) Mining Rau River "at Khasra no. 639, 02,… — under wildlife review, 6 km away
- Proposed Sand, Bajri & Boulder (RBM) Mining Rau River "at Khasra no. 639, 02,… — lapsed, 6 km away
- Environmental Clearance for Change in Product Mix and Fuel by M/S Forace… — environmental approval granted, 6.2 km away
- Environmental clearance for proposed expansion of existing Synthetic Resins,… — returned to applicant, 6.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.