Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Nov 2026 |
| Application filed | 15 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Uttrakhand Payjal Nigam |
| Land area | 1.6 acres (0.7 ha) |
| Forest land | 1.6 acres (0.7 ha) |
| Project cost | ₹14.6 crore |
| Village / locality | Kisyouli |
| Taluk / tehsil | Kafligair |
| District | Bageshwar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-01030 |
In context
14 applications in Bageshwar since January 2022 are in the same category (Water & irrigation): 0 approved, 6 filed or under review, and 8 withdrawn, lapsed or rejected. At 1.6 acres, this one is smaller than 57% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kisyouli, Kafligair, Bageshwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Road From Bageshwar-Tallisera-Simtoli Motor Road to Village… — lapsed, 1.1 km away
- Mobile Tower Installation at Village Raikhail — lapsed, 3.2 km away
- Project: Pankande Soapstone Mining Project — lapsed, 4.5 km away
- Project: Pankande Soapstone Mining Project — cleared for impact study, 4.5 km away
- M/s Jai Maa Bhagawati Mine, Project Location :- Village-Tachhani , Tehsil-… — environmental approval granted, 5 km away
- Kularang Chaura Soapstone Deposit — lapsed, 5.1 km away
- Bhagwati Mines Tachhani Sopostone Mining Project — environmental approval granted, 5.2 km away
- Bhagwati Mines Tachhani Sopostone Mining Project — cleared for impact study, 5.2 km away
More from Uttrakhand Payjal Nigam in Bageshwar
- Bageshwar Nagar (Phase 2) Pumping Water Supply Scheme — lapsed
- Kharai - Patti (Reorganisation) G.O.V Pumping Water Supply Scheme — more information requested
- Ganigaon (Pumping) Water Supply Scheme — lapsed
- Kousani G.O.V (Pumping) Water Supply Scheme — lapsed
- Gadkhet Water Supply Scheme — lapsed
- Gwar G.O.V. (Pumping) Water Supply Scheme — lapsed
All 14 Uttrakhand Payjal Nigam projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.