Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Apr 2025 |
| Application filed | 2 Feb 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Indus Towers LTD |
| Land area | 200 m² |
| Forest land | 230 m² |
| Project cost | ₹10 lakh |
| Village / locality | Rekhouli |
| Taluk / tehsil | Kafligair |
| District | Bageshwar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-01583 |
In context
8 applications in Bageshwar since January 2022 are in the same category (Telecom): 0 approved, 0 filed or under review, and 8 withdrawn, lapsed or rejected.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rekhouli, Kafligair, Bageshwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tarmoli Group of Villages (Pumping) Water Supply Scheme — lapsed, 3.2 km away
- Road From Bageshwar-Tallisera-Simtoli Motor Road to Village… — lapsed, 3.5 km away
- Behargaon-Baksarjhuna-Khola Motor Road — lapsed, 3.8 km away
- Motor road from Ghati (Kafaligair) to Karalagaon — more information requested, 4.3 km away
- Mobile Tower Installation at Village Kholi Dhar — lapsed, 4.8 km away
- राष्ट्रीय राजमार्ग सं0 309 ए के कि0मी0 136 से 169 (बागेश्वर से कनगाडछीना) तक… — lapsed, 4.9 km away
- Pagna & Behargaon Soapstone Mining Project" — cleared for impact study, 5 km away
- Kharai - Patti (Reorganisation) G.O.V Pumping Water Supply Scheme — more information requested, 5.1 km away
More from Indus Towers LTD in Bageshwar
- Mobile Tower Installation at Village Kholi Dhar — lapsed
- Mobile tower Installation at Village Jaggi — lapsed
- Mobile Tower Installation at Vilage Banlekh — lapsed
- Mobile Tower Installation at Village BARI PANYALI — lapsed
5 Indus Towers projects in Bageshwar
All 165 Indus Towers projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.