Quick answers
What is Banda Lagga Bait water supply scheme?
Banda Lagga Bait water supply scheme is a lapsed water and irrigation project in Banda Lagga Bet, Dhanaulti, Tehri Garhwal, Uttarakhand. The site covers 1.5 acres.
Who is building it?
The applicant is Uttarakhand Payjal Sansadhan Vikas Avam Nirman Nigam.
Has it been approved?
No. The application was lapsed on 15 Mar 2024, so it is no longer under consideration.
Where is it?
In Banda Lagga Bet, Dhanaulti, Tehri Garhwal, Uttarakhand.
How big is it?
It has a stated cost of ₹1.5 crore; a site of 1.5 acres and 1.5 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 4 Sept 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 15 Mar 2024 |
| Application filed | 4 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Uttarakhand Payjal Sansadhan Vikas Avam Nirman Nigam |
| Land area | 1.5 acres (0.6 ha) |
| Forest land | 1.5 acres (0.6 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Banda Lagga Bet |
| Taluk / tehsil | Dhanaulti |
| District | Tehri Garhwal |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-01044 |
In context
17 applications in Tehri Garhwal since January 2022 are in the same category (Water & irrigation): 0 approved, 3 filed or under review, and 14 withdrawn, lapsed or rejected. At 1.5 acres, this one is larger than 64% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Banda Lagga Bet, Dhanaulti, Tehri Garhwal, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Maid Water Supply Scheme — lapsed, 1.4 km away
- 0.43 Hectare Reserved/Civil Soyam Forest Land Papara Drinking Water Scheme on… — lapsed, 2.8 km away
- 0.43 Hectare Reserved/Civil Soyam Forest Land for Papara Drinking Water Scheme… — lapsed, 2.8 km away
- Bhunyasari Water Supply Scheme — lapsed, 3.2 km away
- Bhunyasari Water Supply Scheme — lapsed, 3.3 km away
- अगिण्डा पेयजल योजना by Uttarakhand Payjal Sansadhan Vikas Avam Nirman Nigam — more information requested, 3.9 km away
- Laying Optical fiber Cable from Mussoorie to Moriyana Top via Suwakholi,… — more information requested, 4.2 km away
- Khatt Bagi Moriyana Pumping Water Supply Scheme — lapsed, 6.6 km away
More from Uttarakhand Payjal Sansadhan Vikas Avam Nirman Nigam in Tehri Garhwal
- Proposal of Forest Land Transfer for Wtp Underdevprayag Pumping Water Supply… — more information requested
- Maid Water Supply Scheme — lapsed
- अगिण्डा पेयजल योजना by Uttarakhand Payjal Sansadhan Vikas Avam Nirman Nigam — more information requested
- Widening of Hindolakhal G.O.V. Pumping water supply scheme of Devprayag — lapsed
- Anand Chouk GoV Pumiping Water Supply Scheme — lapsed
- Kandi GoV Pumping Water Supply Scheme — lapsed
11 Uttarakhand Payjal Sansadhan Vikas Avam Nirman Nigam projects in Tehri Garhwal
All 100 Uttarakhand Payjal Sansadhan Vikas Avam Nirman Nigam projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.