LapsedRoads & highways · Tehri Garhwal, Uttarakhand

Forest Land Transfer Proposal for Construction of Widening of the Proposed Rishikesh Bypass From 2 Lane to 2 Lane With Paved Shoulder / 4 Lane / 6 Lane From Khairi Khurd (Nepali Farm) to Dhalwala Section Between Km 217.920 to Km 228.800 of National Highway No. 7 (Old NH-58) and SH-83

Forest Land Transfer Proposal for Construction of Widening of the Proposed Rishikesh Bypass From 2 Lane to 2 Lane With Paved Shoulder / 4 Lane / 6 Lane From Khairi Khurd (Nepali Farm) to Dhalwala Section Between Km 217.920 to Km 228.800 of National Highway No. 7 (Old NH-58) and SH-83 is a lapsed road project in Dhalwala, Narendra Nagar, Tehri Garhwal, Uttarakhand. The site covers 84.3 acres. Its stated project cost is ₹15.4 crore. As of 27 Nov 2026, its status is “Lapsed” (since 1 May 2025).

See it on the live map All projects in Tehri Garhwal

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Forest Land Transfer Proposal for Construction of Widening of the Proposed Rishikesh Bypass From 2 Lane to 2 Lane With Paved Shoulder / 4 Lane / 6 Lane From Khairi Khurd (Nepali Farm) to Dhalwala Section Between Km 217.920 to Km 228.800 of National Highway No. 7 (Old NH-58) and SH-83 is a lapsed road project in Dhalwala, Narendra Nagar, Tehri Garhwal, Uttarakhand. The site covers 84.3 acres.

Who is building it?

The applicant is Ministry of Road Transport & Highways.

Has it been approved?

No. The application was lapsed on 1 May 2025, so it is no longer under consideration.

Where is it?

In Dhalwala, Narendra Nagar, Tehri Garhwal, Uttarakhand.

How big is it?

It has a stated cost of ₹15.4 crore; a site of 84.3 acres and 58.8 acres (23.8 ha) of forest land.

When was it filed?

The application was filed on 17 Mar 2025.

Project details

Official titleForest Land Transfer Proposal for Construction of Widening of the Proposed Rishikesh Bypass From 2 Lane to 2 Lane With Paved Shoulder / 4 Lane / 6 Lane From Khairi Khurd (Nepali Farm) to Dhalwala Section Between Km 217.920 to Km 228.800 of National Highway No. 7 (Old NH-58) and SH-83 in District of Dehradun & Tehri Garhwal in the State of Uttarakhand
StatusLapsed
Status since1 May 2025
Application filed17 Mar 2025
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantMinistry of Road Transport & Highways
Land area84.3 acres (34.1 ha)
Forest land58.8 acres (23.8 ha)
Project cost₹15.4 crore
Village / localityDhalwala
Taluk / tehsilNarendra Nagar
DistrictTehri Garhwal
StateUttarakhand
Location fromSite boundary on record
Our referenceWID-UK-01181

In context

63 applications in Tehri Garhwal since January 2022 are in the same category (Roads & highways): 5 approved, 42 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 19 months from filing to approval. At 84.3 acres, this one is larger than 60% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dhalwala, Narendra Nagar, Tehri Garhwal, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ministry of Road Transport & Highways in Tehri Garhwal

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.