In-principle approval, conditions pendingRoads & highways · Tehri Garhwal, Uttarakhand

4-Lane of Rishikesh Bypass from Design Chainage km 529+600 (Near Teenpani Flyover on NH-7) to Design Chainage km 542+420 (Near Kharasrote Bridge), passing through Bhattowala and Dhalwala Village in the State of Uttarakhand (Design Length-12.820 Km) on EPC mode

4-Lane of Rishikesh Bypass from Design Chainage km 529+600 (Near Teenpani Flyover on NH-7) to Design Chainage km 542+420 (Near Kharasrote Bridge), passing through Bhattowala and Dhalwala Village in the State of Uttarakhand (Design Length-12.820 Km) on EPC mode is a proposed road project in Dhalwala, Narendra Nagar, Tehri Garhwal, Uttarakhand. It seeks 114.4 acres of forest land. Its stated project cost is ₹735.8 crore. As of 27 Nov 2026, its status is “In-principle approval, conditions pending” (since 24 Nov 2026).

See it on the live map All projects in Tehri Garhwal

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

4-Lane of Rishikesh Bypass from Design Chainage km 529+600 (Near Teenpani Flyover on NH-7) to Design Chainage km 542+420 (Near Kharasrote Bridge), passing through Bhattowala and Dhalwala Village in the State of Uttarakhand (Design Length-12.820 Km) on EPC mode is a proposed road project in Dhalwala, Narendra Nagar, Tehri Garhwal, Uttarakhand. It seeks 114.4 acres of forest land.

Who is building it?

The applicant is Ministry of Road Transport & Highways.

Has it been approved?

Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.

Where is it?

In Dhalwala, Narendra Nagar, Tehri Garhwal, Uttarakhand.

How big is it?

It has a stated cost of ₹735.8 crore and 114.4 acres (46.3 ha) of forest land.

When was it filed?

The application was filed on 21 Feb 2026.

Project details

Official titleConstruction of 4-Lane of Rishikesh Bypass from Design Chainage km 529+600 (Near Teenpani Flyover on NH-7) to Design Chainage km 542+420 (Near Kharasrote Bridge), passing through Bhattowala and Dhalwala Village in the State of Uttarakhand (Design Length-12.820 Km) on EPC mode
StatusIn-principle approval, conditions pending
Status since24 Nov 2026
Application filed21 Feb 2026
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantMinistry of Road Transport & Highways
Forest land114.4 acres (46.3 ha)
Project cost₹735.8 crore
Village / localityDhalwala
Taluk / tehsilNarendra Nagar
DistrictTehri Garhwal
StateUttarakhand
Location fromSite boundary on record
Our referenceWID-UK-01605

In context

63 applications in Tehri Garhwal since January 2022 are in the same category (Roads & highways): 5 approved, 42 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 19 months from filing to approval.

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dhalwala, Narendra Nagar, Tehri Garhwal, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ministry of Road Transport & Highways in Tehri Garhwal

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.